5 Installation
V-551 Linear Stage
MP160E
Version: 1.1.1
33
Tools and accessories
Four M4 screws of suitable length (p. 50)
Suitable tool for tightening the screws
Affixing the load to the V-551
1.
Align the load on the V-551 so that the mounting holes in the load and the holes in the
motion platform overlap.
2.
Affix the load to the mounting holes with the screws:
−
Maximum permissible torque for M4 screws: 2.6 Ncm
3.
Check that load is affixed firmly.
5.7
Connecting the Motor Cable and Sensor Cable to the V-551
Requirements
You have read and understood the general notes on installation (p. 15).
Motor cable and sensor cable are
not
connected to the controller.
Tools and accessories
K020B0089 motor cable, HD Sub-D 26 (m/f), 3 m in the scope of delivery (p. 9)
K030B0936 sensor cable, Sub-D 15 (m/f), 3 m in the scope of delivery (p. 9)
Suitable controller
Connecting the motor cable and sensor cable to the V-551
1.
Connect the cable:
−
Connect the connector (f) of the motor cable to the 26-pin HD Sub-D panel plug (m)
of the V-551.
−
Connect the connector (m) of the sensor cable to the 15-pin Sub-D socket (f) of the
V-551.
2.
Use the integrated screws to secure the connector (f) and the connector (m) against
accidental disconnection from the V-551.