11
SBACH
Instruction Manual
45
105mm
22mm
22mm
The elevator linkages are assembled as shown below
. Repeat these step for the second servo elevator.
44
. Repeat these step as installing the aileron
linkages (Page 4 and page 5).
49
Control horn
Control horn
4. Slide a crimp onto the cable, then pass the
cable through the threaded cable end. Pass
the cable back into the crimp and use crimping
pliers to secure the crimp to the cable. Guide
the cable into the fuselage to the position for
the rudder servo.
2. The rudder has a block wood plate for mounting
the control horn. Two control horn in positioned
on both side rudder (left and right).
3. Install the control horn to the rudder.
48
Control horn
Screw
Control horn
47
Remove the covering
46
INSTALLING THE RUDDER SERVO
Install the rudder servo to the fuselage as shown.
INSTALLING THE RUDDER LINKAGES
The rudder is controlled by two metal cables.
Install the rudder linkages and cables as below.
1. Use a hobby knife to remove the covering from
the openings for the rudder control cables.