7
SBACH
Instruction Manual
INSTALLING THE MAIN LANDING GEAR
1. Nuts have been installed at the factory.
2. Install main landing gear into the fuselage using
(4) 4mm x 20mm socket head screws and flat
washers provided in the kit.
29
30
31
28
5. Connect the spring.
INSTALLING THE TAIL WHEEL
1. The tail wheel set.
24
26
27
25
2. Remove the covering.
3. Secure the plate to the rudder.
4. Secure the tail brace to the fuselage.