GRAN BARISTO 05 SERVICE MODE
11/30
Number of execution
: represents the number of cleaning cycles (liters) performed on the ma
-
chine group.
Liters since last clean
: represents the total number of liters of water consumed since the last
cleaning cycle group. It is reset after the execution of a complete cleaning cycle group
The submenu
“Water filter”
has the following items:
Current Number:
Current Number: current number of filter within the process chain longevity. It
can range from 0 to 8.
Remain. Cc to expire:
Autonomy of the filter, so the amount of water in cc remaining before
the expiry of the filter.
Total Filter used:
total number of filters turned on the machine
Total water cc:
total amount of water, in cc, which has gone through the machine with active
filters and unexpired.
Remain.
Cc startup: counter of the remaining water, expressed in cc, for the activation of the
first filter of the chain (1/8) . It goes from 5000 to zero: the first filter must be activated before
the counter reaches zero, otherwise it will be necessary to descale before activating the filter.
“Dreg alarm”
: indicates the value at which the counter is reset funds to indicate the alarm funds.
“Dreg counter”
represents funds that the counter is initialized to the value of “Dreg alarm” to
any empty the drawer bottoms and decremented by a value depending on the dose in the ground
made products. When is 0 the machine will display the alarm drain funds.
The item
“Since production”
has the following items:
Liters Coffee/Water:
It represents the total number of liters of water consumed during the exe
-
cution of products coffee (or part mixed coffee) or water.
Liters Steam:
It represents the total number of liters of water consumed during the execution of
milk products (milk or mixed part).
Содержание Saeco GranBaristo
Страница 3: ...GRAN BARISTO CHAPTER 1 INTRODUCTION ...
Страница 9: ...GRAN BARISTO CHAPTER 2 TECHNICAL SPECIFICATIONS ...
Страница 17: ...GRAN BARISTO CHAPTER 3 BRIEF INSTRUCTIONS ...
Страница 24: ...GRAN BARISTO CHAPTER 4 OPERATING LOGIC ...
Страница 32: ...GRAN BARISTO CHAPTER 5 SERVICE MODE ...
Страница 63: ...GRAN BARISTO CHAPTER 6 RERVICING AND MAINTENANCE ...
Страница 66: ...GRAN BARISTO CHAPTER 7 DISASSEMBLY ...
Страница 77: ...GRAN BARISTO CHAPTER 8 NOTES ...
Страница 78: ...GRAN BARISTO 08 NOTES 1 1 ...
Страница 79: ...GRAN BARISTO CHAPTER 9 WATER CIRCUIT DIAGRAM ...
Страница 81: ...GRAN BARISTO CHAPTER 10 ELECTRICAL DIAGRAM ...
Страница 82: ...GRAN BARISTO 10 ELECTRICAL DIAGRAM 1 2 Gran Baristo Avanti ...
Страница 83: ...GRAN BARISTO 10 ELECTRICAL DIAGRAM 2 2 Gran Baristo ...