background image

 

 

Dynalite Hardware 

 

 

....................................... 

 

 

Installation Guide 

 

 

....................................... 

 

 

Page 9 

 

 

....................................... 

 

 

 

14

th

 November 2019 

 

 

www.philips.com/dynalite 

 

Installing Gateways 

In multi-story buildings, each floor typically contains an independent network segment called a spur. Spurs can 
be joined via network gateways to a trunk network (RS-485 or Ethernet) installed in a riser linking all floors 
together. The trunk typically connects to the System Manager head-end software or to a BMS enabling full 
access to the entire system. 

B

 

All circuits and cables connected to gateways must be SELV/Class 2 (UL). 

 

DyNet RS-485 trunk network and DyNet RS-485 spur network 

  

 

Ethernet trunk network and DyNet RS-485 spur network 

13.

 

For RS-485 networks, terminate both trunk and spur connections to gateway. 

a.

 

Spur (Floor sub-network) is terminated to Port 1. 

b.

 

Trunk (Building backbone) is terminated to Port 2. 

14.

 

An RS-485 gateway is powered from the DyNet network spur connected to 
Port 1. Up to 150mA of power from the DyNet network on Port 1 is fed to Port 2, 
so providing there is sufficient power available on the spur, it is normally not 
necessary to provide a network power supply for the trunk network. 

15.

 

When implementing repeaters for long runs, connect the link to Port 2 of both 
gateways (and bridges). Shielded cable must be used for long runs (refer to 
Recommended cable types). Provide additional DyNet power supplies where 
required. 

16.

 

Gateways (or bridges) are required when there are more than  
100 devices on a run, or the current would exceed the cable limit.  

17.

 

RS-485 Gateway Port 2 is used for DMX Receive/Transmit or for third-party integration. 

RS-485 Gateway with third party integration options 

RS-485 SPUR

Port 1

Port 2

RS-485 SPUR

RS

-4

85

 T

R

U

NK

Port 1

Port 2

RS-485 SPUR

RS-485 SPUR

ET

H

ER

N

E

T

R

U

NK

Содержание dynalite

Страница 1: ...t D and D must NOT be connected in a loop 4 A data cable that is connected to an energized device is live Do not cut or terminate live data cables 5 Maximum data cable current 2 Amps 6 The data cable should be segregated from mains cables by a minimum of 50 mm 2 in for shielded cable and 300 mm 12 in for unshielded cable If the data cable crosses over any mains cables it should cross at 90 7 On Bu...

Страница 2: ... two cables to tie them together see final drawing 4 Separate the blue and the blue white wires from each other Then combine them with the matching wires from the other cable blue to blue and blue white to blue white 5 Twist remaining conductors ends with the matching colored wires and fold ends in half Isolate the unused pair with a connector or tape 6 Reuse a wire insulation offcut or heat shrin...

Страница 3: ...ble Use of UTP unshielded CAT5 stranded cables is not recommended however may be allowed for short runs of under 15 m 50 ft where there is no risk of noise coupling UTP cables must be installed in grounded metal conduits if there is a risk of noise coupling from Mains and Class 1 cables switched power circuits high frequency power electronics devices HVAC and motor drives etc Maximum number of dev...

Страница 4: ...aisy chained First and last device DyNet SFLAT6 CABLE RJ12 Pins Color Signal 1 Silver Drain 2 White Ground 3 Red Data 4 Green Data 5 Yellow 12 Volts 6 Brown Not connected Cat5e Ethernet cable RJ45 Pins Color Signal 1 Green White Data 2 Green Data 3 Orange White Not connected 4 Blue 12 24 Volts 5 Blue White 12 24 Volts 6 Orange Not connected 7 Brown White Ground 8 Brown Ground 1 Silver Drain 2 Whit...

Страница 5: ...gure eight cable Maximum bus length of 300 m 1000 ft Maximum 2 V voltage drop between any two DALI devices B DALI is not touch safe and shall be treated as ELV per IEC Classification DALI could be mains potential Only basic isolation is provided The DALI control cable must be handled as live up to 230VAC Total loop resistance on longest run 18 Ohms The cable run distance from any point to the DALI...

Страница 6: ...l wiring DALI Addressable DALI bus wiring to DALI enumerated lamp drivers A DALI universe has up to 64 unique driver addresses DALI Multimaster DALI bus wiring to DALI enumerated lamp drivers and DALI multimaster devices DALI Multimaster devices include sensors e g DUS360CR DALI and dry contact input devices e g DPMI940 DALI DALI Multimaster device and driver limits ...

Страница 7: ... light fittings are installed and connected to the load controller output terminals 8 The number of loads connected to individual channels and total box loading must be within the specified ratings limit for each type of load 9 Load controllers are connected to mains supply 10 Auxiliary input is a programmable dry contact interface that is active low A dry contact is connected between the AUX and ...

Страница 8: ...Dynalite Hardware Installation Guide Page 8 14th November 2019 www philips com dynalite Example Installations DIN rail mounted controllers Wall mounted controllers ...

Страница 9: ...to Port 1 b Trunk Building backbone is terminated to Port 2 14 An RS 485 gateway is powered from the DyNet network spur connected to Port 1 Up to 150mA of power from the DyNet network on Port 1 is fed to Port 2 so providing there is sufficient power available on the spur it is normally not necessary to provide a network power supply for the trunk network 15 When implementing repeaters for long run...

Страница 10: ... with local electrical standards The mounting plate must sit flat onto the wall surface 5 Where panels and buttons are engraved check all labels are in the correct position before clipping into position 6 Antumbra and touchscreen sensor holes must be positioned at the bottom of the device Devices have arrows to show correct orientation 7 Antumbra panels should have 30 cm 12 in clearance from any m...

Страница 11: ... necessary add a network power supply to ensure adequate network voltages during day to day fluctuations Position sensor to detect motion in the specified area 1 Install correct sensor type for location and application wall or ceiling mounted PE PIR ultrasonic high bay outdoor 2 Ensure correct orientation for long and short field of view 3 Install sensor out of direct sunlight 4 Install sensor awa...

Страница 12: ...t sees the light level from one light source such as daylight to adjust light levels elsewhere Closed loop light regulation Open loop light regulation Testing using the inbuilt indicator LED When first connected and powered from the network the red indicator LED on the sensor will flash for 3 minutes when it receives a button message This allows the installer to confirm that the sensor is terminat...

Страница 13: ...s required or for analog control integration 2 Can be installed without a DIN rail by extending DIN rail clips to expose mounting screw holes 3 If used connect voltage free contacts or 0 24V AC DC inputs to any of the eight opto isolated inputs Remove the cover and ensure that the internal jumpers for each input are set to the appropriate 0 24V or voltage free setting according to the input type 4...

Страница 14: ...de is within 10 meters of at least one other node it will operate as a seamless component of the Dynalite system SNS401CMP ZigBee Receiver with Multifunction Sensor The SNS401CMP receives DyNet commands over ZigBee from the PDZG E and sends DALI messages over an SR bus The variant used is the SNS401CMP which is sold with a circular mounting plate as shown here The SNS401CMP is paired with a Philip...

Страница 15: ...D indicator does not light remove the panel and check the wiring and network voltage Repair as necessary refer to the troubleshooting section 5 For touchscreens Use the Preset buttons or Sliders on the page to dim channels and confirm that the touchscreen is communicating with the network 6 All devices are pre programmed for out of the box operation Dynalite load controllers dimmers are set to pro...

Страница 16: ...numerated controller will run a flash sequence for 5 minutes Push and hold for 5 seconds and release Device reset Controller Service LED functions The Service LED has four signaling modes Blinking slowly 0 5Hz Normal operation Blinking normally 1Hz Network activity detected or DMX reception Blinking fast 4Hz Device communicating Permanently ON or OFF Fault D Some devices support a bicolor service ...

Страница 17: ...merican NA 20 V to 26 V between Gnd and 24 VDC terminals Typical Data voltages with reference to Gnd D between 0 2 VDC to 1 0 VDC D between 0 5 VDC to 3 8 VDC D to D must be greater than 300 mV Max network supply load current 2 Amps B Mains fed load controllers and power supplies contribute power to the network Gateways button panels dry contacts and sensors consume power from the network Unrespon...

Страница 18: ... is operating correctly Check if emergency state has been activated Device operates properly but circuit breakers continually trip Earth leakage is exceeded or Short circuit on load Device overloaded Incompatible load Check load wiring for short circuits Verify device loading with current tester remember to de rate for specific loads and install conditions Check total earth leakage Check wiring te...

Страница 19: ...rown Brown white pair Touchscreen issues Symptom Probable cause Solution Device does not operate at all No power available Wiring issue Check power supply adaptor and ensure correct supply voltage Check for broken wires Device is on but not able to control anything Broken power supply wire Broken wire on RS 485 bus Check plug is inserted correctly Check for broken RS 485 wires Check voltage at dev...

Страница 20: ...ut notice No representation or warranty as to the accuracy or completeness of the information included herein is given and any liability for any action in reliance thereon is disclaimed Philips and the Philips Shield Emblem are registered trademarks of Koninklijke Philips N V All other trademarks are owned by Signify Holding or their respective owners Document Revision 06 ...

Отзывы: