PHI 2000 PURO/VAPORE 04 OPERATING LOGIC
4/7
4.3. Coffee cycle operating diagram
Notes: * Only with Pre-brewing
MS status
OFF
Single microswitch gear motor
ON
Switching on
When the machine is switched on, the gear motor repositions itself as follows:
- It acts on microswitch 1 (see following. section)
- The gear motor changes its rotation direction and moves upwards again by approx. 1-2 mm
- The boiler begins to heat water for approx. 45 seconds. It absorbs all the available heating power
in order to reach the optimal temperature. The temperature will then remain at a constant level.
Coffee cycle
1. The coffee grinder starts the grinding process (controlled by pulses generated by a sensor)
2. The gear motor (brewing unit) moves to the dispensing position
3.
Preliminary dispensing phase (short pump activity, short pause)
4.
Product dispensing (the pump operation period is defined by the amount of product dispensed)
5. The gear motor moves to its home position (the dregs are expelled automatically)
Main switch ON
START
STOP
Time
Coffee grinder
Heating
Pump
Brewing unit gear
motor
Status
Heating
Ready
Coffee cycle
Pulses
(Dosage)
Pump activity
(turbine pulses)
depending on the
product quantity
selected
approx.
45 secs.
*
Содержание 2000 PURO/VAPORE
Страница 3: ...CHAPTER 1 INTRODUCTION ...
Страница 10: ...CHAPTER 2 TECHNICAL SPECIFICATIONS ...
Страница 16: ...CHAPTER 3 BRIEF INSTRUCTIONS ...
Страница 26: ...CHAPTER 4 OPERATING LOGIC ...
Страница 34: ...CHAPTER 5 SERVICE MODE ...
Страница 49: ...CHAPTER 6 SERVICING AND MAINTENANCE ...
Страница 52: ...CHAPTER 7 DISASSEMBLY ...
Страница 61: ...CHAPTER 8 NOTES ...
Страница 62: ...PHI 2000 PURO VAPORE 08 NOTES 1 1 ...
Страница 63: ...CHAPTER 9 WATER CIRCUIT DIAGRAM ...
Страница 66: ...CHAPTER 10 ELECTRICAL DIAGRAM ...
Страница 67: ...PHI 2000 PURO VAPORE 10 ELECTRICAL DIAGRAM 1 1 10 1 Electrical diagram PHI 2000 Puro Vapore ...