GB267 I01
23
7.4.1 Further course of action for the scraping of pipe ends
Step
Action
4
Installation for the scraping of pipe ends
4.1
Position the rotational peeling tool so that between about 1/2 and 2/3 of the peeler blade,
depending of the pipe dimension and feed setting, rest on the pipe.
7.4.2 Further course of action for the scraping of saddle installation areas
Step
Action
4
Installation for the scraping of saddle areas
4.1
Position the rotational peeling tool on the desired location on the pipe. The blade should be set on