6.6
6.7
Gas ballast and purge operation on CV version
7
7.1
Maintenance safety instructions
7.2
7.3
7.4
Exchange procedure for replacement products
7.4.1 Disconnecting the pump from the installation
7.4.2 Preparing the pump for shipping
8
8.1
Shutting down for longer periods
8.2
8.3
9
9.1
9.2
10
Service solutions from Pfeiffer Vacuum
11
12
12.1 General
12.2 Technical characteristics
12.2.1Environmental conditions
12.2.2Nitrogen characteristics
12.2.3Electrical characteristics
12.3 Dimensions
12.4 Weight distribution and center of gravity
12.5 Load on foot with fastening kit
Table of contents
4/56
Содержание ACP 28 CP
Страница 1: ...OPERATING INSTRUCTIONS EN Translation of the Original ACP 28 40 Multi stage Roots pump air cooled...
Страница 54: ......
Страница 56: ...112369 Ed 09 Date 2018 06 P N 112369OEN...