background image

 

 

 

 

Petit Auto Wash Inc. 

360-t Installation Manual 

www.PetitAutoWash.com 

P a g e

 | 

4

 

 

Accutrac 360-t Tunnel 

1.4.

 

Framework: 

Please refer to the layout drawings section of the installation manual. 

20” of clearance above the Bridge Rails is needed to unfold the Top Washer. T

-Bars are held to their 

mounting blocks with a shear bolt, do not replace with a regular bolt. Ensure the T-bars are parallel with 
each other and perpendicular to the machine rails. Bridge Keepers bolt on to the outside of the Bridge 
End Plates. 

Legs are universal but are also directional.  Orient all the legs with the drain holes facing inboard or 
toward the center of the bay. All bolts should be inserted from inboard to outboard, so nuts are on 
outside of legs.  

Note that the P.S. Main Rail has two Proximity Switch Target Flags each on the inboard side of the 
rail located at the entrance & exit end of the rail. The D.S. Main Rail has one Proximity Switch 
Target Flag on the inboard side of the rail. Both Main Rails mount w/ the 4-bolt flange holes 
toward the bottom.

 

When installing the Framework, it is important to fasten the legs to the floor exactly as depicted in 
the drawing.

  Leave the entire framework and floor anchors slightly loose, then use a level to 

insure the legs are plumb vertically (front/rear and left/right), before tightening all framework 
fasteners.  Fully tighten the floor anchors last.  

Alternately: If enough man power and Genie Lifts are available wait until the entire framework is 
assembled to fasten the legs to the floor. This will allow you to verify the correct position of the 
legs.

  

Referring to the Rail Kit drawing, layout and mark the floor where each of the legs for the 360-t frame 
will sit.  

Assemble the Cross beams to the legs. If the factory Crossover Plumbing was purchased, one of the Top 
Crossbeams already has channel strut & plumbing attached.  This Crossbeam must be used on the 
entrance legs. The Entrance Crossbeam is attached to the entrance side of the legs. The Exit Crossbeam 
is typically attached to the exit side of the legs.  Be sure to square the legs to the Beam when attaching 
Left to Right Frame Gussets. Tighten the bolts until they are snug, but do not fully tighten at this time.   

Stand up either the Exit or Entrance Cross Beam/ Leg assembly, position the legs EXACTLY as 
dimensioned in the drawing.  Use the corner-to-corner dimension in the drawing to verify squareness 
and fasten loosely to floor. 

Stand up the remaining Exit or Entrance Cross Beam/ Leg assembly and attach the two Longitudinal 
Braces and the Entrance to Exit Gussets, then fasten loosely to the floor. 

 

Содержание Accutrac 360-t

Страница 1: ...2044 Wadsworth Rd Norton Ohio 44203 www PetitAutoWash com Rev 8 18 360 t Tunnel Installation Manual...

Страница 2: ...ay 14 1 7 E Chain 17 1 8 Bridge Mount LED 144w 19 2 Mechanical Room Equipment 20 2 1 360 t HMI Control Panel 20 2 2 25HP Variable Frequency Drive Panel 21 2 3 25HP Pump Stations Tall Vehicle Solenoid...

Страница 3: ...ift with side shift capability Minimum 5ft to 6ft long fork extensions Caster Wheel Kits are available that attach to shipping crates and bridge cradles Be extraordinarily careful when picking the cra...

Страница 4: ...slightly loose then use a level to insure the legs are plumb vertically front rear and left right before tightening all framework fasteners Fully tighten the floor anchors last Alternately If enough...

Страница 5: ...t will insure that the upper framework stays plumb and square Do not over tighten the fasteners in the drive rails This can crush the tubing and cause alignment issues for the drive wheels The Entranc...

Страница 6: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 6 Accutrac 360 t Tunnel Accutrac 360 t Entrance...

Страница 7: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 7 Accutrac 360 t Tunnel Accutrac 360 t Exit...

Страница 8: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 8 Accutrac 360 t Tunnel Main Rail P S Entrance Main Rail P S Exit...

Страница 9: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 9 Accutrac 360 t Tunnel...

Страница 10: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 10 Accutrac 360 t Tunnel...

Страница 11: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 11 Accutrac 360 t Tunnel Raising the E Chain...

Страница 12: ...t in the Entrance end of the DS Main Rail If loading from the Entrance leave one bolt in the opposite end Now remove the bolts that hold the Cradle to the Bridge and lower the Cradle to the ground Fli...

Страница 13: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 13 Accutrac 360 t Tunnel Bridge Inboard P S...

Страница 14: ...s approximately 45 above the ground Use the provided luggage scale to verify the spring heights below which will result in the correct breakaway force Over tightening the spring will cause structural...

Страница 15: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 15 Accutrac 360 t Tunnel...

Страница 16: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 16 Accutrac 360 t Tunnel...

Страница 17: ...erminal blocks strip the insulation 3 8 7 16 to ensure a proper connection At opposite end of E Chain connect the hoses to the bulkhead Route the two multi conductor cables and quad air tubing to the...

Страница 18: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 18 Accutrac 360 t Tunnel E Chain Bulkhead Crossover Plumbing Group Optional...

Страница 19: ...nnect leads on both sides Find the cord that has a waterproof plug inserted into the quick disconnect This end of the LED Light must be oriented to the driver side Bundle and tie wrap the cord to the...

Страница 20: ...l as close to the bay equipment as possible Mount the panel to the wall at a height that the Touch Screen is readily accessible Route the two multi conductor cables from the bay equipment to the panel...

Страница 21: ...tes When wiring the pump station note that not all 3 phase motors are not wired the same Refer to the diagram on the inside of each motor junction box for correct wiring specifications Some installati...

Страница 22: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 22 Accutrac 360 t Tunnel Tall Vehicle Solenoid Refer to Pump Station Installation Manual for additional information...

Страница 23: ...Terminate the Brown wires on the appropriate Output relay and the Blue wires to 24VAC Common Route the quad airline to the Air Solenoids as shown Solenoid 0010 Rotate to Front of car Solenoid 0011 Ro...

Страница 24: ...he cable Latch the wire stripping tool onto the top of the cable Spin the tool in the direction shown Make sure the first 360 degree cut is inline and not spiraling Note Make a test cut at the very en...

Страница 25: ...with the cutters Remove the metal shielding Note This step is where most nicking of wires occurs At the VERY END of the cable cut into the inner white shielding to find the orange pull string Cut up...

Страница 26: ...018 Profile XP 1 clear B Freq Bottom yellow 1019 Profile XP 2 clear A Freq grey 1020 Profile XP 3 clear B Freq pink 1021 Profile XP 4 clear A Freq Top If no Top Washer Jumper to 24VDC blue 1022 Pulse...

Страница 27: ...te yellow 0014 Remote Alarm Light Same as Panel Light Relay Dry Contact yellow brown 0015 PE Inhibit PE White wire to DC Relay 24VDC OUTPUTS 360 t Tunnel C B Amps Voltage Description CB 1 5A 120VAC PL...

Страница 28: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 28 Accutrac 360 t Tunnel 3 3 Appendix C Wire Number Terminal Layouts...

Страница 29: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 29 Accutrac 360 t Tunnel...

Страница 30: ...Trolley Extend Prox I BOT Bottom Impact Prox Trolley Bridge Motor Terminal Strip Layouts 360 i 360 t D S Trolley Motor J B DS TM P S Trolley Motor J B PS TM Note Oscillator Motor Trolley Motor wires b...

Страница 31: ...q Bottom PE Inhbt 7 1019 Profile XP 2 A freq Grn 7 GND 8 1020 Profile XP 3 B freq 9 1021 Profile XP 4 A freq Top 10 24AC B5 24VAC Enclosure Htr 11 24AC C 24V Com Enclosure Htr Grn 12 GND Photo eyes Ca...

Страница 32: ...Petit Auto Wash Inc 360 t Installation Manual www PetitAutoWash com P a g e 32 Accutrac 360 t Tunnel 3 4 Appendix D Tunnel Rail Kit Parts List...

Отзывы: