
e.doc
Rev.
07.07.2015
Seite
‐
Page
57
/
64
Perrot
REGNERBAU
CALW
GmbH
Industriestraße
19
‐
29
/
D
‐
75382
Althengstett
/
Germany
Telefon
:
0049
‐
7051
‐
162
‐
0
/
Fax
:
0049
‐
7051
‐
162–133
E
‐
mail:
/
E
‐
Konstruktion
:
Install
Output
Modules
1.
Unplug
the
controller
from
the
mains.
2.
Remove
front
cover.
3.
Press
the
new
output
module
upwards
into
the
terminal
board.
Replace
the
fixing
screw
and
connect
the
coil
cable.
4.
Check
proper
function
of
the
system.
5.
Set
station
run
time
of
the
irrigation
program
for
the
new
modules
as
described
earlier.
The
controller
software
automatically
detects
the
number
of
stations
installed.
This
number
cannot
be
exceeded
during
programming.
Replace
Output
Module
1.
Unplug
the
controller
from
the
mains.
2.
Remove
front
cover.
3.
Disconnect
the
power
supply
cable
from
the
damaged
expansion
module.
4.
Unscrew
the
module
fixing
screw.
5.
Pull
the
output
module
downwards
from
the
terminal
board.
6.
Press
the
new
output
module
upwards
into
the
terminal
board.
Replace
fixing
screw
and
connect
the
coil
cable.
7.
Check
proper
function
of
the
system.
Note
The
output
module
(see
chapter
5
–
The
Controller)
is
replaceable.
It
has
been
designed
to
burn
in
case
of
an
over
‐
voltage
on
the
field
side
to
protect
the
controller
motherboard
from
damage.
Chapter
7
–
Troubleshooting
provides
guidance
for
analysing
various
faults
of
output
modules.