
e.doc
Rev.
07.07.2015
Seite
‐
Page
54
/
64
Perrot
REGNERBAU
CALW
GmbH
Industriestraße
19
‐
29
/
D
‐
75382
Althengstett
/
Germany
Telefon
:
0049
‐
7051
‐
162
‐
0
/
Fax
:
0049
‐
7051
‐
162–133
E
‐
mail:
/
E
‐
Konstruktion
:
Note:
If
the
designated
time
of
a
station
is
exceeded,
the
failure
will
be
logged
in
the
„sensor
position“
menu
(see
next
figure).
The
number
shown
in
the
center
of
the
sensor
position
bar
equals
the
number
of
failures
of
the
individual
station.
To
delete
the
failure
log,
please
calibrate
this
station.
Cycle
time
The
time
entered
in
this
menu
is
only
used
to
calculate
the
runtime
of
an
irrigation
program.
Due
to
the
fact
that
the
number
of
sector
runs
is
entered
in
the
controller
instead
of
a
certain
time,
the
controller
will
calculate
the
runtime
as
follows:
Runtime
=
number
of
sector
runs
x
cycle
time
Please
set
cycle
time
as
follows:
Use
and
to
select
„cycle
time“
Use
or
to
increase/decrease
the
selected
digit
Adjustment
range:
60
–
180
seconds
Factory
setting:
120
seconds
Note:
At
max.
rotation
speed
the
VP3
sprinkler
needs
about
70
seconds
for
a
sector
of
180°.
The
sector
time
should
be
at
least
50
%
longer
so
that
the
calculated
runtime
is
definitely
longer
than
the
actual
runtime
in
order
to
avoid
overlapping
start
times.