
39
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
D4 Climbing procedure
Inserting into the climbing
shoe at RCS C
Observe Section D5 and the Instruc-
tions for Assembly and Use for Rail
Climbing System RCS C.
Before the last stroke:
Standard case:
Vertical bearing at the height of the
intermediate platform
■
Top climbing shoe (
5A
) is deactivat-
ed.
■
In order to allow for easier insertion
into the top climbing shoe, open both
folding runners.
■
Middle climbing shoe (
5B
) is activat-
ed.
Alternatively:
Vertical bearing at the height of the
working platform
■
Top climbing shoe (
5A
) is activated.
■
Both folding runners are closed.
■
Middle climbing shoe (
5B
), on which
the climbing device is placed, is de-
activated during the last stroke.
Adjusting the climbing system
■
In order to allow for easier insertion,
the framework can be adjusted.
■
By turning the Framework Spindle
(
19
), the inclination of the top climb-
ing rail (
9A
) is adjusted relative to the
bottom climbing rail (
9B
).
■
In the event of a lateral offset, extend
the cylinders to the same height.
Fig. D4.08
Fig. D4.09
5A
9
5A
9A
5B
19
9B
Содержание 135413
Страница 58: ...58 RCS 2 Climbing Device and Hydraulics Assembly Instructions F2 Declaration of incorporation...
Страница 59: ...59 RCS 2 Climbing Device and Hydraulics Assembly Instructions F2 Declaration of incorporation...
Страница 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions F2 Declaration of incorporation...