2
When all posts have two L
brackets on, use a drill with
1/2" masonry bit to drill down
about 1/2" farther than length
of wedge anchor.
Make sure the posts are all level
and everything is square. With
base trim still raised, fasten two
L-brackets on the outside edges
of each post with five 2 1/2"
screws per bracket. Some engi-
neering specifications may
require 4 brackets per post.
NOTE: For HD High Wind
brackets see bracket appendi-
ces on page 24-25 (Steps 2-4.)
Before inserting the bolt, make
sure dust is removed from
hole. Then screw the nut and
washer are on about 1/8”
below the top of the bolt. Next,
insert the wedge anchor bolt
into the hole. To protect the
threads and nut, tap the bolt
into the ground with a piece of
wood as a buffer.
Once the wedge anchor is
down against the bracket, use
a wrench and tighten it. Do
that with all the anchors.
8
X2
1/2”
20
21
23
22
Содержание WOOD PAVILION
Страница 25: ...4 Continue on with regular instructions at step 23 25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...
Страница 30: ...30 19 20...
Страница 32: ...32...