Next, drive 2 1/2” screws
every 16” along the entire
length of the fascia board.
Follow these same steps with
the other short-sided fascia
board.
14
Install the corner trim by
fastening it to the beams with
four 2 1/2” screws.
47
Starting on the long side, hold
fascia in place butting the top
of the fascia board against a
square, following the pitch of
the decking. Fascia should not
be lower than the pitch of the
decking; the end of the fascia
should remain flush with the
end of the plate.
Moving to the short side,
hold fascia in place, butting
the top of the fascia board
against a square following
the pitch of the decking.
Fascia should not be lower
than the pitch of the roof
decking; the end of the fascia
should extend out to be flush
with the long side fascia
board.
45
46
44
SIDE
VIEW
Note: With metal roof installation,
fascia should be installed 3/4" higher
than the top of the roof decking.
Содержание WOOD PAVILION
Страница 25: ...4 Continue on with regular instructions at step 23 25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...
Страница 30: ...30 19 20...
Страница 32: ...32...