CL-05.2 Lock Controller
Note:
Use normally closed electromechanical locks as an OD in this configuration.
Electromagnet or normally open electromechanical locks can be used only having
the interposing relay installed.
16. Connect Ethernet cable, coming from controller to the local network. Use RJ45
adapter from the delivery set and cable #1 in order to make an extension (Fig. 3,
Table 3).
Note:
Controller power connection through PoE-splitter is given in Appendix 1.
17. Install power supply to its permanent operation position. Connect cable #2 (Fig. 3,
Table 3) to the power supply and to the controller.
18. Lay and fix cables using plastic staples (e.g. SC4-6, SC5-7, SC7-10). During cable
installation and cable laying it is necessary to consider the requirements given in
Section 8.2.
19. Check lack of breaks and short circuits in all the lines.
Figure 1. Controller back side
outline
Figure 2. Hole spacing for controller installation
(housing dimensions and a hole for cable laying are
dotted)
13
Содержание CL-05.2
Страница 1: ...Lock Controller CL 05 2 OPERATION MANUAL ...
Страница 2: ...Lock Controller CL 05 2 Operation Manual ...
Страница 15: ...Operation Manual Figure 3 Controller connection scheme 14 ...
Страница 24: ...CL 05 2 Lock Controller Figure 5 Controller connection scheme through PoE splitter 23 ...
Страница 40: ......
Страница 42: ...www perco com ...