
2
0
2
0
-0
4
42
VisuNet GXP
Mechanical Installation
7.
Route the cable through the cable gland on the TCU/PCU. Install the wire ends per the tables
below.
Wiring Guide
DATL-IDM-DB-S-XX00-N0 to IDM-Z1-160* and Base Station IDM-Z1-x61-B-N0* Ex i
DATL-IDM-DB-S-XX00-N0 to IDM-Z1-260*
TCU
Cable
Terminal
Signal
Name
Direction
Assignment
Color coding
Pin M12 con-
nector
Xx.1
Vcc
Supply
Vcc
green
1
Xx.2
GND
Supply
GND
brown
3
Xx.3
-
-
-
-
-
Xx.4
-
-
-
-
-
Xx.5
-
-
-
-
-
Xx.6
RxD
I
TxD
white
4
Xx.7
-
-
-
-
-
Xx.8
-
-
-
-
-
TCU
Cable
Terminal
Signal
Name
Direction
Assignment
Color coding
Pin M12 con-
nector
Xx.1
Us
Supply
Vcc
green
1
Xx.2
RxD
I
TxD
white
4
Xx.3
-
-
-
-
-
Xx.4
-
-
-
-
-
Xx.5
GND
Supply
GND
brown
3
Xx.6
-
-
-
-
-
Xx.7
-
-
-
-
-
Xx.8
-
-
-
-
-
Note
For detailed information on electrical installation, refer to the TCU/PCU and IDM* barcode
reader manuals.
Содержание VisuNet GXP Series
Страница 1: ...VisuNet GXP RM GXP1100 19S RM GXP1200 19S PC GXP1100 19S PC GXP1200 19S Manual...
Страница 19: ...VisuNet GXP Mechanical Installation 2020 04 19 4 Remove and discard the screws from the bottom of the housing...
Страница 22: ...2020 04 22 VisuNet GXP Mechanical Installation 4 Attach the cable to the pull wire...
Страница 36: ...2020 04 36 VisuNet GXP Mechanical Installation Figure 3 4 Technical drawing dimensions with scanner holder...