Mechanical Installation
3.1
General Installation Requirements
Observe the following requirements when installing the system components.
•
The equipment must be installed by competent personnel in accordance with the instruc-
tions. National laws and regulations must be observed.
•
The building installation must provide a 20 A overcurrent protection.
•
The installer must make a readily accessible disconnect device available.
•
The safety of any system incorporating the power supply unit is the responsibility of the
assembler of the system.
3.2
Installation Tools
•
4-mm and 5-mm torque Allen keys
•
Open-ended wrench for cable glands
•
Screws for floor or wall mounting. Choose the appropriate screws based on the mounting
conditions.
•
Small cable ties
•
Side cutters
•
Strong adhesive tape, such as duct tape or packing tape
•
At least 1 piece of thin, 2.5-m-long wire for pulling cables through the pedestal
Warning!
Risk of injury
Lifting the device on your own may lead to injury.
Do not attempt to lift the device on your own. Use a crane or have another person help you.
Содержание VisuNet GXP Series
Страница 1: ...VisuNet GXP RM GXP1100 19S RM GXP1200 19S PC GXP1100 19S PC GXP1200 19S Manual...
Страница 19: ...VisuNet GXP Mechanical Installation 2020 04 19 4 Remove and discard the screws from the bottom of the housing...
Страница 22: ...2020 04 22 VisuNet GXP Mechanical Installation 4 Attach the cable to the pull wire...
Страница 36: ...2020 04 36 VisuNet GXP Mechanical Installation Figure 3 4 Technical drawing dimensions with scanner holder...