
VisuNet GXP
Mechanical Installation
2
0
2
0
-0
4
21
Preparing the Pedestal for Connection to the GXP Housing
1.
Remove the cable glands at the bottom of the pedestal.
2.
Feed the pull wire (thin, 2.5-m-long wire for pulling cables through pedestal) through the top of
the pedestal and out the appropriate cable entry.
3.
Put the gland nut and ferrule of the cable gland on the cable and slide them a few meters down
the length of the cable away from the pedestal. Keep the nut and ferrule on the cable in order to
tighten them in a later installation step.
Bottom of Pedestal
1
PE stud
2
M25 opening
3
M20 opening
4
M20 plug
1
2
3
4
Warning!
Connection to the PE stud
Connection to the PE stud is mandatory.
Opening Size
Wrench Size
Cable Diameter
Torque
M20
24 mm
7 ... 13 mm
12 Nm
M25
29 mm
9 ... 17 mm
Содержание VisuNet GXP Series
Страница 1: ...VisuNet GXP RM GXP1100 19S RM GXP1200 19S PC GXP1100 19S PC GXP1200 19S Manual...
Страница 19: ...VisuNet GXP Mechanical Installation 2020 04 19 4 Remove and discard the screws from the bottom of the housing...
Страница 22: ...2020 04 22 VisuNet GXP Mechanical Installation 4 Attach the cable to the pull wire...
Страница 36: ...2020 04 36 VisuNet GXP Mechanical Installation Figure 3 4 Technical drawing dimensions with scanner holder...