
2
0
2
0
-0
4
38
VisuNet GXP
Mechanical Installation
Required Installation Tools
•
Flat head screwdriver
•
19 mm socket wrench for counter nut and connector
•
Size 2.5 hex wrench for cable tie screws
•
Safety gloves
All tools should be torque controlled if a torque is specified.
Connector cable DATL-IDM-DB-S-XX00-N0
Figure 3.6
Connector cable for wired 1-D scanner IDM-Z1-160-D-1D-J1- S-* (S3-Interface required)
and 2-D scanner IDM-Z1-260-D-2D-J1-S* (S4-interface required) 4-wire with
ferrules
—
IDM scanner connection via M12 connector.
Note
Supports only RS-232 scanner / base station
Содержание VisuNet GXP Series
Страница 1: ...VisuNet GXP RM GXP1100 19S RM GXP1200 19S PC GXP1100 19S PC GXP1200 19S Manual...
Страница 19: ...VisuNet GXP Mechanical Installation 2020 04 19 4 Remove and discard the screws from the bottom of the housing...
Страница 22: ...2020 04 22 VisuNet GXP Mechanical Installation 4 Attach the cable to the pull wire...
Страница 36: ...2020 04 36 VisuNet GXP Mechanical Installation Figure 3 4 Technical drawing dimensions with scanner holder...