
VisuNet GXP
Mechanical Installation
2
0
2
0
-0
4
39
Installing the cable DATL-IDM-DB-S-XX00-N0
1.
Open the AG1 housing. See chapter 3.3.5
2.
Remove the plug at the bottom-right side of the housing by holding the screw steady from
below with a screwdriver while loosening the screw from above with a wrench.
Содержание VisuNet GXP Series
Страница 1: ...VisuNet GXP RM GXP1100 19S RM GXP1200 19S PC GXP1100 19S PC GXP1200 19S Manual...
Страница 19: ...VisuNet GXP Mechanical Installation 2020 04 19 4 Remove and discard the screws from the bottom of the housing...
Страница 22: ...2020 04 22 VisuNet GXP Mechanical Installation 4 Attach the cable to the pull wire...
Страница 36: ...2020 04 36 VisuNet GXP Mechanical Installation Figure 3 4 Technical drawing dimensions with scanner holder...