Installation
2
0
1
6
-0
9
27
Installing the Code Tape
1. Clean the surface of any greasy or oily deposits and dust.
2. Ensure that the surface is dry, clean, and stable.
3. Pull away a few centimeters of the protective film at the beginning of the code tape. Place
the code tape at the precise point of the required starting position on the surface, and press
to attach.
4. Then affix the code tape along the desired travel path. Remove the protective film gradually
so that the code tape does not accidentally adhere to the surface in the incorrect position.
When affixing, ensure that the code tape does not crease or trap air bubbles.
The adhesive on the code tape hardens after 72 hours.
Figure 3.21
The center line indicates the center of the code tape and not the center of the code
Position the code tape so that the
www.pepperl-fuchs.com
label and the position markings
are to the right of the Data Matrix code in the X direction. The position values then increase
along the X direction.
Data Matrix Code Tapes with a Starting Position of 0 m
Data Matrix control codes
Note!
Thermal Expansion of the Code Tape
The affixed code tape corresponds to the heat expansion coefficient of the surface with regard
to its thermal expansion.
Code Tape Dimensions
Order designation
Description
PGV10M-CA25-0
Code tape, length: 10 m
...
...
PGV100M-CA25-0
Code tape, length: 100 m
Table 3.1
See also data sheet PGV*-CA25-* at www.pepperl-fuchs.com
Order designation
Description
PGV-CC25-001
Code tape, Control Code 001, length: 1 m
...
...
PGV-CC25-999
Code tape, Control Code 999, length: 1 m