MAINTENANCE INSTRUCTIONS
67
Expansion vessel
(see fig. 2)
•
Close the shut-off valves and drain the central
heating circuit of the boiler.
•
Use a
19 mm
wrench to unscrew the pipe
coupling to the vessel.
•
Unscrew the fixing screws and remove the
upper mounting bracket. Remove the expansion
vessel from the left side of the boiler.
•
Replace the expansion vessel and re-
assemble the components following the above
procedure in reverse order.
•
Switch on the electricity, water and gas
supplies and fill the system with water. Check for
any leaks from the joints and bleed off any air
from the circuit;
Содержание PCH 50B-H
Страница 8: ...GENERALINFORMATION 5 ...
Страница 9: ...GENERALINFORMATION 6 ING ...
Страница 10: ...GENERALINFORMATION 7 ...
Страница 11: ...GENERALINFORMATION 8 ...
Страница 14: ...TECHNICALCHARACTERISTCS 11 2 2 Dimensions ...
Страница 35: ...INSTALLATION INSTRUCTION 32 Venting Pictures Illustrations ...
Страница 36: ...INSTALLATION INSTRUCTION 33 Part No PAHVK Horizontal Vent Kit ...
Страница 40: ...INSTALLATION INSTRUCTION 37 ...
Страница 41: ...INSTALLATION INSTRUCTION 38 Follow all venting manufacturers guidelines for low profile terminations ...
Страница 75: ...73 6 12 Sequence of operations ...
Страница 76: ...74 ...
Страница 77: ...75 ...
Страница 78: ...76 ...
Страница 79: ...77 ...