INSTALLATION INSTRUCTION
26
3.9 Gas Connection
3.9.1 Gas Piping Guidelines
Follow all local codes and/or the most recent edition of the National Fuel Gas Code (ANSI
Z223.1/NFPA 54) in the USA or the Natural Gas and Propane Installation Code in Canada
(CAN/CSA B149.1).
3.9.2 Gas Supply Lines Pressures
The minimum and maximum inlet gas pressures are Natural Gas Min. 7.00
”WC – Max.
12.00
”WC. and Propane Gas Min. 11.00”WC – Max. 14.00”WC.
Gas pressures over and above the specified range will result in adverse
performance and dangerous operating conditions; any damage resulting from
extreme gas supply pressures will not be covered by the limited warranty.
Until pressure testing of the main gas supply line is completed, ensure the gas line
to the PENSOTTI Boiler is disconnected to avoid any damage to the boiler.
The appliance and its individual shut off valve must be disconnected from the
gas supply piping system during any pressure testing of that system at test
pressures in excess of 0.5 psi (3.5 kPa)..
The appliance must be isolated from the gas supply piping system by closing its
individual manual shut-off valve during any pressure testing of the gas supply
system at test pressures equal to or less that 0.5 psi (3.5 kPa).
The gas appliance and its gas connections must be leak tested before placing the
appliance in operation. Leaks can be found by using a gas leak detection device
or by applying soapy water to all gas fittings. Should bubbles occur, tighten those
connections and re-test.
Always purge the gas line for any debris before connecting to the boiler gas inlet.
Never use an open flame to test for gas leaks as property damage, personal injury or death
could result.
The maximum inlet gas pressure must not exceed the valve specified by the
manufacturer and that the minimum valve listed as for the purposes of input adjustment.
The connection to the gas supply must be carried out by professionally qualified personnel in
accordance with the relevant standards.
■
Check the internal and external seals of the gas supply system.
■ A gas shut-off valve and sediment trap must be installed upstream of the appliance .
■ Before starting up the boiler, make sure that the type of gas corresponds to that for which
the appliance has been set-up.
■ The gas supply pressure must be between the values
reported on the rating plate.
■ Conversion of the appliance from natural gas to LPG
or vice versa must be carried out by qualified personnel.
■ The power supply cable must be replaced by a qualified
electrician. If the cable is damaged in any way, switch
off the appliance and have the cable replaced by a
suitably qualified electrician.
When using an electrical appliance, a few fundamental
rules must be observed:
Do not touch the appliance
with damp or wet parts of the body or when barefoot. Do
not pull on the electric wires.
Do not allow the appliance to be used by children or
anyone unfamiliar with its operation.
Содержание PCH 50B-H
Страница 8: ...GENERALINFORMATION 5 ...
Страница 9: ...GENERALINFORMATION 6 ING ...
Страница 10: ...GENERALINFORMATION 7 ...
Страница 11: ...GENERALINFORMATION 8 ...
Страница 14: ...TECHNICALCHARACTERISTCS 11 2 2 Dimensions ...
Страница 35: ...INSTALLATION INSTRUCTION 32 Venting Pictures Illustrations ...
Страница 36: ...INSTALLATION INSTRUCTION 33 Part No PAHVK Horizontal Vent Kit ...
Страница 40: ...INSTALLATION INSTRUCTION 37 ...
Страница 41: ...INSTALLATION INSTRUCTION 38 Follow all venting manufacturers guidelines for low profile terminations ...
Страница 75: ...73 6 12 Sequence of operations ...
Страница 76: ...74 ...
Страница 77: ...75 ...
Страница 78: ...76 ...
Страница 79: ...77 ...