TECHNICAL CHARACTERISTCS
10
2. TECHNICAL CHARACTERISTICS
2.1 Technical data
Model
PCH 50B-H
CE Certification
n°
0694CO7385
Appliance Type
B23p-B33-C13-C33-C43-C53-C63-C83-C93
Appliance Category
II2H3B/P
Heat Input max
kW
– BTU 50 – 170600
Heat Input min
kW
– BTU 12 - 40900
AFUE
%
91.2
Efficiency (Full load) - 122/86°F
%
95
Efficiency (Full load) - 176/140°F
%
87.7
Efficiency Partial load - 122/86°F
%
97.5
Central Heating circuit
Central Heating water temperature setting (min-
max)
°C
– °F
35-85 / 25-45
– 95-185 / 77-113
Max. heating working temperature
°C
– °F
85-185
Expansion vessel capacity
l/gal
6 - 1,58
Max. working pressure (heating)
bar - psi
2,1 - 30
Min. working pressure (heating)
bar - psi
0,3
– 4,29
Dimensions (Boiler casing size)
Width
in
19.3
Height
in
27.6
Depth
in
18.5
Weight (net)
lb
120
Hydraulic connections
Central Heating Flow connection
Soldier
¾”
Central heating Return connection
Soldier
¾”
Cold water mains connection
Soldier
½”
D. Hot water connection
Soldier
¾”
Gas connection
NPT
¾”
Flue systems
Horizontal Concentric flue system
Ø mm - in 80/125
– 3,15/5
Max. Flue length (from terminal to terminal)
m - ft
5 - 16
2 pipes non concentric flue system (flue and air intake)
See Table Section 3.11
Max flue length (from terminal to terminal
– 2
pipes)
See Table Section 3.11
Gas Supply
Natural gas
Inlet pressure
“ wc
7.0 min
– 12.0 max
Propane
Inlet pressure
“wc
11.0 min
– 14.0 max
Electrical specifications
Power supply
V/Hz
120/60
Electrical power consumption
W
190
Electrical protection
IP
X4D
Содержание PCH 50B-H
Страница 8: ...GENERALINFORMATION 5 ...
Страница 9: ...GENERALINFORMATION 6 ING ...
Страница 10: ...GENERALINFORMATION 7 ...
Страница 11: ...GENERALINFORMATION 8 ...
Страница 14: ...TECHNICALCHARACTERISTCS 11 2 2 Dimensions ...
Страница 35: ...INSTALLATION INSTRUCTION 32 Venting Pictures Illustrations ...
Страница 36: ...INSTALLATION INSTRUCTION 33 Part No PAHVK Horizontal Vent Kit ...
Страница 40: ...INSTALLATION INSTRUCTION 37 ...
Страница 41: ...INSTALLATION INSTRUCTION 38 Follow all venting manufacturers guidelines for low profile terminations ...
Страница 75: ...73 6 12 Sequence of operations ...
Страница 76: ...74 ...
Страница 77: ...75 ...
Страница 78: ...76 ...
Страница 79: ...77 ...