Pensotti Heatline Quatech Series
29
Figure 11
In addition to all of the previous stated information regarding Natural Draft Applications and
Mechanical Draft Applications the following additional instructions for Direct Vent Applications
must be followed while referencing
Figure 11
;
•
That the maximum wall thickness is no more than 14". Contact PNA for recommendations in
case of a thicker wall.
•
That the PNA-Flex-L system is not designed for common venting. Use for a single appliance
only unless otherwise approved.
•
Utilize an appliance adapter test port for combustion testing as required by Flex-L.
•
Follow the national codes for the installation of oil burning equipment: in USA - NFPA 31, in
Canada - CAN/CSA-B139 and local regulations.
Installing The Joint Assembly
1) Loosen the gear clamps attached to the adapter sleeve and slide the adapter sleeve over the vent
pipe,
Figure 12
and
Figure 13
.
2) Pull the corrugated inner tube out of the vent pipe for easy access to insert the adapter.
3) Apply sealant around the corrugated end of the adapter.
4) Align the flat seams at the end of both corrugated tubes and insert the adapter into the vent tube.
Screw the adapter into the vent pipe with a counterclockwise motion. The adapter should be fully
inserted into the inner vent tube until it’s tight. The seams of both tubes must be aligned for ease
of insertion. If the adapter does not completely screw into the vent pipe, unscrew it and try again
as per Step # 4.
Содержание DK2 Series
Страница 4: ......
Страница 5: ......
Страница 33: ...Pensotti Heatline Quatech Series 28 DIRECT VENTING GUIDE ...
Страница 38: ...Pensotti Heatline Quatech Series 33 Figure 18 Figure 19 Figure 20 Figure 21 ...
Страница 40: ...Pensotti Heatline Quatech Series 35 ...