Pensotti Heatline Quatech Series
21
•
At least 1' from any roof soffit or ridge vent.
•
At least 7' above any public walkway.
•
All of the vent construction consists of suitable materials, and terminates at an approved
stainless steel hood.
•
All of the vent piping is sealed from air leaks.
•
The vent pipe bend radius is 12".
•
Place metal strapping every 36" to support vent pipe and prevent it from sagging.
•
Follow the national codes for the installation of oil burning equipment: in USA - NFPA 31,
in Canada - CAN/CSA-B139 and local regulations.
Figure 10
Do not install vent terminals on prevailing wind wall side of structure. Moisture and ice may
form around terminal. Make sure the surface is in good repair and protected from damage.
Power Venter Applications
When using a power venter, all of the recommendations and instructions of the OEM of the power
venter MUST be followed and the entire installation must conform to any and all local, State, and
National codes.
Содержание DK2 Series
Страница 4: ......
Страница 5: ......
Страница 33: ...Pensotti Heatline Quatech Series 28 DIRECT VENTING GUIDE ...
Страница 38: ...Pensotti Heatline Quatech Series 33 Figure 18 Figure 19 Figure 20 Figure 21 ...
Страница 40: ...Pensotti Heatline Quatech Series 35 ...