Rev. 1.0
Penguin Computing
12
6. Stacking the Chassis
The chassis should not be stacked on any other equipment. If the chassis
falls, it can cause bodily injury and equipment damage.
7. Redundant Power Supply Connection - Electrical Hazard
This product includes a redundant power or a blank in its place. If a blank is
present, do not operate the product with the blank cover removed or not
securely fastened.
8. Double Pole/Neutral Fusing
This system has double pole/neutral fusing. Remove all power cords before
opening the cover of this product or touching any internal parts.
9. Multiple Power Inlets — Risk of electric shock and energy hazard.
The PSUs are all independent. Be sure to disconnect all power supplies to
ensure a powered-down state inside of the switch platform.
10. During Lightning - Electrical Hazard
During periods of lightning activity, do not work on the equipment. Do not
connect or disconnect any cables.
11. CopperCable Connecting/Disconnecting
Copper cables are heavy and inflexible, as such they should be carefully
attached or detached from the connectors. Refer to the cable manufacturer
for special warnings/ instructions.
12. Rack Mounting and Servicing
When this product is mounted or serviced in a rack, special precautions must
be taken to ensure that the system remains stable. In general you should fill
the rack with equip- ment starting from the bottom to the top.
13. Equipment Installation
This equipment should be installed, replaced, and/or serviced only by trained
and qualified personnel.
14. Equipment Disposal