Page 24
Connecting to the application
Once the initial purge run of 30 minutes has completed, and the generator has been
running for 1 hour, (required to reach purity for the application) it is ready to be
connected to the application(s)
The pressure in the internal storage tanks must be allowed to dissipate
before connecting the generator to the application(s)
Attach the appropriate fitting(s) to the outlet(s) of the generator. Using the tubing
supplied, connect the outlet(s) of the generator to the inlet(s) on the application.
If you require more tubing than is supplied please refer to the Tubing Lengths section.
Once the tubing is connected to the application, please ensure that it
is thoroughly checked for being leak-tight. Even the slightest leak in
the gas supply between the generator and the application can lead to
a reduction in efficiency.
Tubing Lengths
The diameter of the tubing which will be connected to the gas outlet is
important and is determined by the length of tubing required. Failure
to follow these recommendations could lead to pressure between
generator and application.
< 10 meters:
Use ¼”/
3
⁄
16
” (¼” O/D,
3
⁄
16
” I/D) P.T.F.E. tubing.
> 10 - 40 meters: Use
3
⁄
8
”/
5
⁄
16
” (
3
⁄
8
” O/D,
5
⁄
16
” I/D). Tubing and fittings not supplied
in
the
fittings
kit.
> 40 metres:
Please contact Peak Scientific with the relevant distance and
we will calculate the flow resistance and the tubing size required.
A combination of ¼”/
3
⁄
16
” and
3
⁄
8
”/
5
⁄
16
” tubing may be used to ensure that there is no large
diameter tubing within the lab (i.e. for the first 20 meters from the generator use
3
⁄
8
”/
5
⁄
16
”
and the final 10 meters to the application use ¼”/
3
⁄
16
” tubing). Keep the connections and
bends to a minimum.
CAUTION
CAUTION
CAUTION
Содержание Genius 1050
Страница 34: ...Page 34...
Страница 35: ...Page 35...