Page 23
Start-Up Sequence
Before the Generator is connected to the application, the Generator
should be operated in isolation (i.e. not connected to the application)
for thirty minutes. This is to ensure any impurities present are purged
from the system. Failure to do this may harm the application.
Before re-connecting the Generator to the mains and switching it on for the isolation
run, it is necessary to fit the silencer to the outlet port of the output panel.
Once this is done, the Generator can be re-connected to the mains and switched on.
Pressure will start to build in the internal storage tanks which can be monitored by
watching the output pressure gauge on the front panel. This will climb to the factory set
pressure as noted in the specifications.
Once this pressure is reached, the compressors will continue to run until the internal
tank upper pressure limit is reached and the compressor has run for a period of at least
two and a half minutes.
The compressors will then rest until the internal tank lower pressure limits is reached.
Once this limit is reached the compressors will switch back on again. This compressor
cycling is normal and will continue throughout the operation of the Generator.
When the system has been operated for a period of 30 minutes, all the internal pipe-
work and storage tanks will have been purged with Nitrogen or Nitrogen and Dry Air.
The Generator is now purged and the tubes can be connected at the rear of the unit.
CAUTION
Содержание Genius 1050
Страница 34: ...Page 34...
Страница 35: ...Page 35...