background image

26 

PEERLESS® PARTNER® PV 

SERIES INDIRECT FIRED WATER 

HEATER 10/2 LIMITED 

WARRANTY 

5/2 LIMITED WARRANTY for 

PV80 and PV120

 

Ten (or 5) Year Limited Tank Replacement Policy 

Two Year Limited Tank Replacement Labor Allowance 

One Year Limited Parts Warranty 

PB Heat, LLC, (hereinafter called the company) offers the following Limited Tank Replacement 
Policy, Limited Tank Replacement Labor Allowance, and Limited Parts Warranty to the original 
purchaser/owner of this stone-lined 

Peerless® Partner® PV Series indirect

 water heater. 

These warranties are not transferable beyond the original purchaser/owner, and are not valid if 
the tank is removed from initial installation site. THIS WARRANTY SPECIFICALLY 
EXCLUDES ANY IMPLIED WARRANTY OF MERCHANTABILITY OR OF FITNESS FOR ANY 
PARTICULAR PURPOSE, AS WELL AS ANY PERFORMANCE WARRANTY. The Company 
reserves the right to require proof of purchase and inspection and/or testing of tank as a 
condition of these warranties. 

LIMITED TANK REPLACEMENT POLICY 
DURATION: 
1. 

STANDARD DURATION:

 (10) years from the date of manufacture as indicated by the 

serial number. Exceptions: (5) years for the PV80 and PV120 and see Limit ations below. 

1. 

OPTIONAL LIFETIME DURATION: 

(available to residential, single family homes 

only)(Not available for the PV80 and PV120). For as long as the original purchaser owns 
the home in which the 

Peerless® Partner® PV Series was

 originally installed. Optional 

Lifetime replacement Policy is not effective unless 

PB Heat, LLC 

receives completed 

registration card and payment within 30 days of purchase (see cover for details).

 

IF NO CARD IS RETURNED OR PAYMENT RECEIVED, THE REPLACEMENT 
POLICY WILL BE THE STANDARD 10-YEAR WARRANTY AND WILL BEGIN FROM 
THE MANUFACTURED DATE INDICATED BY THE SERIAL NUMBER ON THE TOP 
PERFORMER. 

COVERAGE: 

Replacement policy covers only the storage tank for leaks caused by the 

corrosive effects of water under normal and proper use. Recovery under the terms of this 
agreement is subject to prior approval by the company. The tank replacement policy excludes 
any performance warranty or any warranty implied or specific of merchantability and fitness for 
its intended use. 

COMPANY OBLIGATION:

 Repair of the original tank or replacement of the entire heater with 

a new comparable model is at the option of the company and constitutes the fulfillment of 

ALL

 

obligations of the Company hereunder. In replacing or repairing the 

Top Performer,

 the 

company reserves the right to make such changes in details of design, construction or material 
as shall in their judgment constitute an improvement of former practices. 

REPLACEMENT:

 When a replacement is made under the terms of this policy, the replacement 

unit will have a policy of replacement and labor allowance only for the remaining time under the 
original policy. The Company reserves the right to require the return of the defective unit at the 
expense of the purchaser. 

LIMITATIONS:

 The duration of the tank replacement policy on the tank assembly shall be 

reduced to a period of five years if (1) the purchaser is a business, partnership or corporation, 
or if (2) the 

Peerless® Partner® PV Series 

is used for a commercial, institutional, industrial, 

non-residential or multi-application. All repairs or replacements will be made F.O.B. the 
company. The purchaser must pay for transportation service, labor, installation, administrative 
fees or other costs involving the repair or replacement of such part. 

YOUR ACTION:

 When you discover a defect, immediately notify the dealer from whom the 

heater was purchased. If you cannot locate the dealer, contact the Company. 
 
 

TWO YEAR LIMITED TANK REPLACEMENT LABOR A.LLOWANCE: 

The Company shall 

pay up to a maximum of $200, for the labor to exchange a tank that is leaking due to the 
corrosive effects of water within two years from date of installation. 

Содержание Peerless Partner PV-120

Страница 1: ...Operation and Installation Manual Peerless Partner PV Series Indirect Fired Water Heater Limited Warranty and Tank Replacement...

Страница 2: ...lation and care in use of the product There is risk of property damage and personal injury inherent in the use of any hot water system The Company cannot supervise the installation and therefore makes...

Страница 3: ...ol SR503 EXP shown 18 Zoning Panel with HydroStat 3250 Oil Boiler control SR503 shown 19 Zoning Panel with PureFire Boiler SR503 shown 19 FIGURE 1 20 FIGURE 2 20 FIGURE 3 21 FIGURE 4 22 PARTS LIST 23...

Страница 4: ...r Rating gal h Min Heat Source output MBH Min Heat Source Flow gpm Heat Source Friction Loss Feet w c PV 40 30 0 0 8 177 199 115000 8 0 18 7 PV 60 55 0 0 6 177 217 115000 8 0 18 7 PV 80 80 0 0 4 315 3...

Страница 5: ...mage in the event of a leak Place the heater on a solid foundation in a clean dry location nearest the boiler The heater should be protected from freezing and water lines should be insulated to reduce...

Страница 6: ...ent of materials as meeting the requirements for Relief Valves and Automatic Gas Shutoff for Hot Water Supply Systems ANSI Z21 22 1971 This valve must be marked with maximum set pressure not to exceed...

Страница 7: ...t is recommended to use unions as per FIGURE 1 and FIGURE 2 Do not apply heat directly to the cold water inlet as it includes a plastic dip tube which will melt Water connections are 3 4 male threaded...

Страница 8: ...by a steady flow of water from the open faucet H THERMOSTAT INSTALLATION Place hole in back of Thermostat over the temperature sensor leads It should fit flush against the tank Use the provided self...

Страница 9: ...rollers and switching relays follow applicable wiring diagrams for typical low voltage thermostat circuits J INSULATION INSTALLATION Place included fiberglass insulation between and around the water s...

Страница 10: ...tank or connected fittings D TEMPERATURE AND PRESSURE RELIEF VALVE Warning Improper installation will present potential hazard to life and property A T P Relief Valve with an 8 inch stem should be use...

Страница 11: ...highest hot water faucet Open cold water inlet valve and fill system H WIRING Verify that wiring matches thermostat diagrams Check that water heats to desired temperature I INSTALLATION COMPLETED AND...

Страница 12: ...ter faucet and measure the maximum temperature with an accurate thermometer If the temperature is above the safe limits for your circumstances call a service technician to adjust or replace the contro...

Страница 13: ...nect all electrical supply to heater Remove cover to Thermostat Adjust right side lever to the desired temperature Moving lever down will decrease temperature See THERMOSTAT DIAGRAM 1 NOTE Markings on...

Страница 14: ...stic O ring housing must be properly installed See FIGURE 4 Failure to do this will void the warranty Install and secure the clamp and nut in the following manner o Place the clamp around the flange a...

Страница 15: ...vice personnel should check the heater s operations and controls Make certain the water heater is filled before placing it in operation C DRAINING THE HEATER CAUTION Shut off the boiler before drainin...

Страница 16: ...15 THERMOSTAT DIAGRAM 1 THERMOSTAT DIAGRAM 2...

Страница 17: ...Inserting the probe wires into the press release connector 4 A Position tool on top of white buttons 4 B Push Down on buttons and push wires Down into holes in top of connector This can also be done...

Страница 18: ...Relay Panels Some models do not work with Power Stealing thermostats The ETC101 is a power stealing thermostat unless powered separately from the TT terminals as shown in the 3 wire or 4 wire configur...

Страница 19: ...r may be used to power the Partner ETC101 limit control 24V terminals in lieu of using a zone relay Connect Partner T T terminals and Partner circulator directly to PureFire DHW Switch terminals and D...

Страница 20: ...19 Zoning Panel with HydroStat 3250 Oil Boiler control SR503 shown Zoning Panel with PureFire Boiler SR503 shown...

Страница 21: ...20 FIGURE 1 Installation Diagram Using Zone Valves Note PV80 and PV120 have 1 inch HX fittings and 1 1 2 inch hot and cold fittings FIGURE 2 Installation Diagram Using Separate Circulator...

Страница 22: ...21 FIGURE 3 Typical Piping Peerless PureFire Boiler...

Страница 23: ...22 FIGURE 4...

Страница 24: ...he top of the heater for easy installation and access Heat Exchanger Connections Located on the top of the heater for easy installation and access Long Life Heat Exchanger Copper wound finned tubing f...

Страница 25: ...PV80 WP0458050429 51376 COIL KIT PARTNER PV120 WP0459050429 2 51377 GASKET KIT PARTNER PV40 60 MS016043 51378 GASKET KIT PARTNER PV80 120 MS016043032 3 51382 V CLAMP PARTNER PV FA0803827000 4 51379 CO...

Страница 26: ...vice your heater in the field A qualified installer or service technician must do all service work Therefore if you have any questions about your new water heater concerning service adjustment repair...

Страница 27: ...rs only the storage tank for leaks caused by the corrosive effects of water under normal and proper use Recovery under the terms of this agreement is subject to prior approval by the company The tank...

Страница 28: ...l provided with the unit and all applicable local and national codes 1 The unit must be operated within the factory calibrated temperature limits and water pressure not exceeding 150 psi 2 Any failure...

Страница 29: ...owing information should be noted At time of installation and retained for future reference Model No Serial No Date Installed Dealer s Name Address City State Zip 131 S Church Street Bally PA 19503 Re...

Страница 30: ...29 NOTES...

Страница 31: ...TALLATION ___________________________________________ Optional Lifetime Warranty on newly purchased tanks Not available on replacement tanks may be purchased by completing and returning this form to P...

Отзывы: