2
A. ACCESSIBILITY CLEARANCES
Install boiler with not less than 24” (610 mm) between
the top and front of the boiler and adjacent wall or other
appliance, when access is required for servicing.
B. CLEARANCE FROM COMBUSTIBLE
CONSTRUCTION
The design of this boiler is certified for alcove installation
with the following clearances from combustible
construction:
1. Sides: 6” (152 mm)
2. Top of Jacket: 36” (914 mm)
3. Draft Hood: 6” (152 mm)
4. Vent Pipe: 6” (152 mm )[1” (25 mm) for Type B
vent]
5. Rear of Jacket: 6” (152 mm)
6. Hot Water Pipes: 1” (25 mm)
7. If it is necessary to build a non-combustible floor pad
over top of an existing combustible floor, construct
pad as stated in the current edition of
National Fuel
Gas Code Handbook
under “Installation of Specific
Equipment”, or CAN/CGA B149 Installation Codes
under “General”.
C. COMBUSTION & VENTILATION AIR
1. Provide adequate facilities for combustion and
ventilation air in accordance with current edition of
National Fuel Gas Code
under “Air for Combustion
and Ventilation”,
or applicable provisions of the
local building code, or CAN/CGA B149 Installation
Codes. Subsections 2 through 8 below are based on
National Fuel Gas Code
requirements.
PREINSTALLATION
1. PREINSTALLATION
Do not install boiler on carpeting. Boiler installation
on carpeting is a fire hazard.
⚠
WARNING
Do not install this boiler on combustible flooring.
Boiler installation on combustible flooring is a fire
hazard.
⚠
WARNING
Carefully read these instructions before beginning work. Understand all aspects of the installation. Contact your PB Heat sales
representative or customer service for help in answering questions.
The boiler warranty can be voided if the boiler is not installed, maintained and serviced correctly.
The equipment must be installed in accordance with installation requirements of the authority having
jurisdiction or, in the absence of such requirements, to the current edition of the
National Fuel Gas Code
, ANSI
Z223.1/NFPA 54 or CAN/CGA B149 Installation Codes.
Where required by the authority having jurisdiction, the installation must conform to
American Society of
Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers,
ASME CSD-1.
NOTICE
This manual is intended for use by Qualified Heating Professionals only. Installation, service, or adjustment
of this heating appliance by anyone other than a Qualified Heating Professional can cause significant property
damage, personal injury, or death.
WARNING
This boiler is equipped with a feature that saves energy by reducing the boiler water temperature as the heating
load decreases. This feature is required on residential models (GM-e-05 and GM-e-06) in accordance with Section
325 (f) (3) of the Energy Policy and Conservation Act. This feature is equipped with an override which is provided
primarily to permit the use of an external energy management system that serves the same function.
THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE:
• An external energy management system is installed that reduces the boiler water temperature as the
heating load decreases.
• This boiler is not used for any space heating
• This boiler is part of a modular or multiple boiler system having a total input of 300,000
BTU/hr or greater.
• This boiler is equipped with a tankless coil.
IMPORTANT
Содержание Peerless Boilers GM Series
Страница 1: ...GM Boilers Series Gas Installation Operation Maintenance Manual...
Страница 21: ...19 ELECTRICAL Figure 6 2 Wiring Diagram Spark Ignited Pilot Hydrolevel 3200 Limit control...
Страница 25: ...23 Figure 8 3 Operating Instructions Spark Intermittent Ignition START UP PROCEDURES...
Страница 26: ...24 START UP PROCEDURES Figure 8 4 Operating Instructions Spark Intermittent Ignition...
Страница 38: ...REPAIR PARTS Figure 12 3a Figure 12 3b 36...
Страница 40: ...REPAIR PARTS 13 14 15 16 17 24 25 22 21 20 19 18 23 Figure 12 4 38...
Страница 42: ...NOTES 40...