16
1. Size and install the gas supply piping to provide
a supply of gas sufficient to meet the maximum
demand of all appliances without undue loss
of pressure between the meter and the boiler.
Maximum permissible gas supply pressure to the
boiler is 13.5 inches (3.4 kPa) water column.
2. Determine the volume of gas to be provided to the
boiler. Obtain this value by dividing the Btu per
hour (Watts) rating (on the boiler rating plate) by the
heating value of the gas in Btu per cubic feet (Joules
per cubic meter). Obtain the heating value of the gas
from the gas supplier. As an alternative, use Table
5.1 to obtain the volume of gas to be provided to the
boiler.
3. Table 5.2 shows the maximum flow capacity of
several pipe sizes based on 0.3” w.c. (.08 kPa) of
water pressure drop. These values are based on a
specific gravity of 0.60. Apply the factors indicated
in Table 5.3 for gas with specific gravity other than
0.60 to obtain corrected capacities.
4. Connection of boiler to the gas piping system may
be made on the left side or top of the boiler. See
Figure 11.1 for jacket opening locations.
5. Install a sediment trap. See Figure 5.1. Locate a tee
in the drop pipe at same elevation as the gas inlet
connection to the boiler. Extend the drop pipe to a
pipe cap. As an alternate, the sediment trap may be
located in the boiler vestibule. See Figure 5.2.
6. Install a ground joint union ahead of the gas control
assembly to permit servicing of the control. Some
local codes require an additional equipment shutoff
valve when using the combination gas controls. If
your code requires such a valve, a suggested location
is shown in Figure 5.1 or 5.2.
7. Check piping for leaks. Use an approved gas
detector, a non-corrosive leak detection fluid or other
leak detection method. If leaks are found, turn off all
gas flow and repair as necessary.
5. GAS PIPING
Figure 5.1: Gas Connection to Boiler - External
GAS PIPING
Capacity of Schedule 40 pipe [cu. ft. per hour (cu. m per
hour)] with pressure drop of 0.3 in. (75 Pa) and specific gravity
of 0.60. No allowance for an ordinary number of fittings is
required.
Table 5.1: Input
Model
Natural Gas
LP Gas
(Cubic Feet
Per Hour)
(Cubic Meter
Per Hour)
(Cubic Feet
Per Hour)
(Cubic Meter
Per Hour)
GM-e-05
214.5
6.1
86
2.4
GM-e-06
268
7.6
107
3.0
GM-07
342
9.7
137
3.9
GM-08
399
11.3
160
4.5
Natural gas based on 1000 Btu/Cubic Foot (37,300 kJ/m³).
LP gas based on 2,500 Btu/Cubic Foot (93,145 kJ/m³).
Table 5.2: Capacity of Schedule 40 Pipe
Table 5.3: Maximum Capacity Correction Factors
Specific Gravity other than 0.60
Specific Gravity
0.50
0.55
0.60
0.65
0.70
0.75
Correction Factor
1.10
1.04
1.00
0.96
0.93
0.90
Specific Gravity
0.80
0.85
0.90
1.00
1.10
1.20
Correction Factor
0.87
0.84
0.82
0.78
0.74
0.71
Specific Gravity
1.30
1.40
1.50
1.60
1.70
1.80
Correction Factor
0.68
0.66
0.63
0.61
0.59
0.58
Use a pipe joint sealing compound that is resistant to
the action of liquefied petroleum gas. A non-resistant
compound may lose sealing ability in the presence of
this gas, resulting in a gas leak and fire or explosion
potential.
⚠
WARNING
When checking for leaks, do not use matches,
candles, open flames or other methods that provide
a source of ignition. This can ignite a gas leak,
resulting in fire or explosion.
⚠
WARNING
Pipe
Length
Feet
3/4”
Pipe
1”
Pipe
1-1/4”
Pipe
1-1/2z’
Pipe
ft.³
m³
ft.³
m³
ft.³
m³
ft.³
m³
10
278
7.8
520
15 1,050 30 1,600 45
20
190
5.4
350
9.9
730
21 1,100 31
30
152
4.3
285
8.1
590
17
890
25
40
130 3.7 245 6.9 500
14
760
22
50
115 3.3 215 6.1 440
12
670
19
60
105 3.0 195 5.5 400
11
610
17
Содержание Peerless Boilers GM Series
Страница 1: ...GM Boilers Series Gas Installation Operation Maintenance Manual...
Страница 21: ...19 ELECTRICAL Figure 6 2 Wiring Diagram Spark Ignited Pilot Hydrolevel 3200 Limit control...
Страница 25: ...23 Figure 8 3 Operating Instructions Spark Intermittent Ignition START UP PROCEDURES...
Страница 26: ...24 START UP PROCEDURES Figure 8 4 Operating Instructions Spark Intermittent Ignition...
Страница 38: ...REPAIR PARTS Figure 12 3a Figure 12 3b 36...
Страница 40: ...REPAIR PARTS 13 14 15 16 17 24 25 22 21 20 19 18 23 Figure 12 4 38...
Страница 42: ...NOTES 40...