13
Reset of filter runtime
After a filter change the counter for the filter runtime has to be reset. The reset is carried out by pushing the button
boost ventilation mode / reset filter runtime > 3 s. The quick flashing cycle of the LED in the filter-symbol is ended.
All maintenance work performed must be documented in check list A!
What to do in the event of a failure?
Please contact the installer immediately in the event of a failure. Make a note of the error display and the failure code
respectively. Also note down the type of your CLIMOS, for that purpose, see type plate on the side of the device.
The mains connection must always be available, unless the CLIMOS must be put out of operation due to a serious
failure, maintenance work or for other imperative reasons.
As soon as a power disconnection has been performed, the living space is not mechanically
ventilated anymore. This may cause moisture and mould problems in the living space. Therefore,
the long-term shutdown of the CLIMOS has to be avoided!
For the period of absence, the plant should be operated at the lowest fan speed or in the un-
occupied mode!
Disposal
When the life time cycle of your CLIMOS has expired, the company PAUL Wärmerückgewinnung GmbH offers you
free take-back. If you do not make use of the possibility of feedback of recyclable product parts into the cycle of
materials, we would like to remind you that the CLIMOS must not be disposed of in the normal household garbage.
For this kind of disposal, please obtain information on the possibilities of reuse of components or the eco-friendly
treatment of the materials from you community.
3
Hints for qualified personnel
Installation
requirements
For proper installation, the following requirements must be fulfilled:
•
Assembly in accordance with the general and on-site safety and installation instructions, amongst others of
the electric power station and water works as well as in accordance with the instructions contained in this
operating manual.
•
Frost-free room in the interior
•
Voltage supply 230 Vac, 50-60 Hz
•
Sufficient space for air duct connections and maintenance work
Transport and packing
Proceed with care when transporting and unpacking the CLIMOS.
The packaging of the device may only be removed immediately before assembly! Prior to and during
assembly interruptions, the open air duct connection stubs must be protected with the caps of the
air connection against ingress of construction dust and moisture!
Checking of the scope of delivery
If you detect any damages or incompletion to/of the delivered product, please contact the supplier
immediately. The scope of delivery includes:
•
HRU CLIMOS, check the type plate and make sure that it is the correct construction type; right (type A) or left
(type B);
•
230 V power cable with plug connection of a lower power device; length 2 m
•
Control
panel;
•
Operating
manual;
•
4 mounting brackets
•
Set of design filter covers (option)
Mounting
For the CLIMOS, the distances to adjoining surfaces, which are not shown to scale in Fig. 8, must be observed. The
surfaces may consist of combustible materials.
Содержание CLIMOS F 200 Eco
Страница 1: ...Version 1 1_08 2019 EN...
Страница 32: ...32 Dimensional sketch Fig 44 Dimension drawing...
Страница 33: ...33 Circiut diagram CLIMOS Eco series Fig 45 Terminal assignment CLIMOS Eco...
Страница 38: ...38 Product fiche...