Hardware installation
SmartNode 2400 installation consists of the following:
Note
If you will be installing the 40V line power module prior to installing
an interface card or ISDN S-Bus, refer to chapter 8,
“Line power
module installation”
on page 125.
•
Installing an interface card (if the card was not installed at the factory). Refer to chapter 9,
“Interface card
installation”
on page 133 to install the card, then return to this chapter.
•
Placing the device at the desired installation location (see section
“Mounting the SmartNode 2400”
on
page 111)
•
Installing the interface and power cables (see section
“Connecting cables”
on page 114)
When you finish installing the SmartNode 2400, go to chapter 10,
“Getting Started with the SmartNode
Device”
on page 139.
Mounting the SmartNode 2400
The SmartNode 2400 should be placed in a dry environment with sufficient space to allow air circulation
for cooling.
Note
For proper ventilation, leave at least 2 inches (5 cm) to the left, right,
front, and rear of the SmartNode 2400.
The SmartNode 2400 can be installed as follows:
•
Placed on a desktop or similar sturdy, flat surface that offers easy access to the cables
•
Mounted inside a 19-inch equipment rack
Note
To prevent overheating we recommend that the SmartNode 2400 not
be installed in a closed rack or in a room that is not properly venti-
lated or air-conditioned.
Содержание 1000
Страница 12: ...Compliance Information SmartNode 1000 and 2000 Series Getting Started Guide 12 Compliance...
Страница 52: ...2 Product Overview SmartNode 1000 and 2000 Series Getting Started Guide 52...
Страница 62: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 62...
Страница 68: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 68 Where to go next...
Страница 70: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 70...
Страница 80: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 80 Connecting cables...
Страница 82: ...5 SmartNode 1400 installation SmartNode 1000 and 2000 Series Getting Started Guide 82...
Страница 92: ...6 SmartNode 2300 installation SmartNode 1000 and 2000 Series Getting Started Guide 92...
Страница 110: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 110...
Страница 124: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 124 Connecting cables...
Страница 126: ...8 Line power module installation SmartNode 1000 and 2000 Series Getting Started Guide 126...
Страница 134: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 134...
Страница 138: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 138 Installing interface cards...
Страница 140: ...10 Getting Started with the SmartNode Device SmartNode 1000 and 2000 Series Getting Started Guide 140...
Страница 151: ...151 Chapter 11 Monitoring Status Chapter contents Status LEDs 153...
Страница 152: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 152...
Страница 154: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 154 Status LEDs...
Страница 156: ...12 Contacting Patton for assistance SmartNode 1000 and 2000 Series Getting Started Guide 156...
Страница 160: ...A Specifications SmartNode 1000 and 2000 Series Getting Started Guide 160...
Страница 166: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 166...
Страница 172: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 172 BRI Figure 102 Connecting a BRI to an NT...
Страница 175: ...T1 PRI 175 SmartNode 1000 and 2000 Series Getting Started Guide B Cabling...
Страница 176: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 176 T1 PRI...
Страница 178: ...C Port pin outs SmartNode 1000 and 2000 Series Getting Started Guide 178...