P-K SOLIS™
Gas Fired Boiler
Technical Service 1.877.728.5351
Revised: March 15, 2021
Released: March 15, 2021
Patterson-Kelley 2021
All Rights Reserved.
2701000090 P-K SOLIS NURO Installation and
Owners Manual (Rev A).docx
Page 57
3. Test the manual reset high-temp limit. Refer to
3.10.3
.
4. Test the low gas pressure switch. Refer to
3.10.4
.
5. Test operating temperature controls by reducing or increasing temperature settings as
necessary to check burner operation.
6. Check the combustion chamber drain piping for leaks or obstructions.
Semi-Annually
In addition to the recommended monthly service:
1. Clean burner of any accumulated dust or lint. Refer to
5.3
.
2. Inspect burner for any signs of deterioration or corrosion. Replace immediately if deterioration
or corrosion is evident.
3. Check the pH level of the system fluid. Verify the pH is in accordance with
Appendix C –
Water Quality Standards Quality Standards for Hydronic Boilers in Multi-Metal Systems
4. Inspect and clean the condensate system and check for leaks. If a condensate neutralization kit
is present, open the lid and inspect the limestone rocks. If they are absent or have been
significantly worn away, replace them with new limestone rocks. Use high-calcium (or pure)
limestone.
Annually
In addition to the recommended monthly and semi-annual service:
1. Inspect and clean the inlet screen of any accumulated dust or lint.
2. Check burner and clean off any soot or foreign material that may have accumulated. Refer to
5.3
. Check for corrosion of the burner and its parts. If there is evidence of deterioration or
corrosion, replace immediately. Inspect combustion chamber when the burner is removed for
inspection. Note any signs of deterioration. Clean as necessary.
3. Inspect and clean heat exchanger. Remove the various covers to inspect the flue gas
passageways. Clean the combustion side casting pins by flushing with clean water and blowing
dry with compressed air. Do not use any cleaning agents or solvents. Do not use soap. A soft
nylon brush may be used in accessible areas. Be sure to inspect condensate collection pan
that is the lowest part of the heat exchanger.
4. Replace the ignition electrode and gasket.
5. Drain and flush the water side of the heat exchanger as required (separate from system flush)
using clean water only.
6. Take a sample of the system fluid and verify the water quality is in compliance as defined in
Appendix C – Water Quality Standards Quality Standards for Hydronic Boilers in Multi-
Metal Systems
.
7. Inspect and clean the condensate system and check for leaks. If a condensate neutralization kit
is present, open the lid and inspect the limestone rocks. If they are absent or have been
significantly worn away, replace them with new limestone rocks. Use high-calcium (or pure)
limestone.
8. Examine the venting system. Refer to the vent manufacturer's instructions for requirements in
addition to those listed below.
NOTICE!
Installation and service must be performed by a qualified installer or service agency that
has been trained on the appliance.