MACHINE RUN-IN AFTER THE FIRST 8 HOUR
IMPORTANT
After the first 8 hours this should be tightened
-
Wheel nuts
-
Side brush nuts
-
Hydraulic hoses, Couplings
-
Elevators alu rakes nuts
The sweeper must be checked continuously, to ensure that the function is maintained and
that any consequentially damage is prevented.
15
Содержание ABL GIANT 3.0
Страница 6: ...ASSEMBLY DRAWING Main dimension Front view Back view 6...
Страница 7: ...ASSEMBLY DRAWING Main Dimension Side view Component view 7...
Страница 10: ...POSITIONING OF SAFETY AND WARNINGS LABELS 10...
Страница 21: ...SWEEPING FUNCTION OF ABL ES SWEEP CONTROL 21...
Страница 39: ...LUBRICATION AND MAINTENANCE WORK BRAKE SCHEDULE 39...
Страница 55: ...TECHNICAL INORMATION HYDRAULIC CIRCUIT 55...
Страница 56: ...TECHNICAL INFORMATION ELECTRIC CIRCUIT 56...