LUBRICATION AND MAINTENANCE INTERVAL SCHEDULE
8 Hours service or if needed after daily inspection
These following points should be lubricated
-
Lower elevator shaft (
A
) right and left bearing
-
Upper elevator shaft (
B
) right and left bearing
-
Centre brush bearing (
C
) left side
-
Centre brush bracket (
C
) right and left side
-
Conveyor drive rollers (
D
) right and left bearing
-
Side brush sliding axle (
E
) right and left side
-
Collector shoe (
F
) bushing right and left side bolts
-
Drawbar (
G
)
8 hours service / inspection should return at intervals of 8 hours
25
Содержание ABL GIANT 3.0
Страница 6: ...ASSEMBLY DRAWING Main dimension Front view Back view 6...
Страница 7: ...ASSEMBLY DRAWING Main Dimension Side view Component view 7...
Страница 10: ...POSITIONING OF SAFETY AND WARNINGS LABELS 10...
Страница 21: ...SWEEPING FUNCTION OF ABL ES SWEEP CONTROL 21...
Страница 39: ...LUBRICATION AND MAINTENANCE WORK BRAKE SCHEDULE 39...
Страница 55: ...TECHNICAL INORMATION HYDRAULIC CIRCUIT 55...
Страница 56: ...TECHNICAL INFORMATION ELECTRIC CIRCUIT 56...