15
Tables
P a r r I n s t r u m e n t C o m p a n y
104
c
haPter
15
Tables
Table 15-1
Factory Default Settings
Calorimeter Operations
Operating Mode
Determination
Bomb Installed/EE
1/940.0
Heater and Pump
OFF
Operating Controls
Method of Operation
Dynamic
Reporting Units
BTU/lb
Use Spiking Correction
OFF
“OTHER” Multiplier
4.1868
Calibrate Touchscreen
LCD Backlight Timeout(s)
1200 S
LCD Backlight Intensity
70%
Print Error Messages
ON
Language
English
Spike Controls
Use Spiking
OFF
Heat of Combustion of Spike
6318.4
Use Fixed Spike
OFF
Weight of Fixed Spike
0.0
Prompt for Spike before Weight
OFF
Bomb Rinse Tank Control
Report Rinse Tank Empty
ON
Rinse Tank Capacity
150
# Rinses Left
150
Reset Rinse Tank Counter
Rinse Time
25
Rinse Flush Time
20
Clear Time
100
# of Rinse Cycles
3
Program Information and Controls
Date
XX/XX/XXXX
Time
XX:XX
Volume Level Adjust
85%
Software and Hardware Info
Settings Protect
OFF
User/Factory Settings
Feature Key
Bomb Type Select
User Function Setup
Cold Restart
User/Factory Settings
User Setup ID
64-1138
Reload Factory Default Settings
Reload User Default Settings
Save User Default Settings
Calibration Data & Controls
Calibration Run Limit
10
EE Max Std Deviation
0.0
Heat of Combustion of Standard
6318.4
Bomb Service Interval
500
Use Bomb
1
Bomb 1 Through 4
EE Value
940
Protected EE Value
OFF
Thermochemical Corrections Standardization
Fixed Fuse Correction
ON 50.0
Acid Correction
Fixed HN03, 8.0
Fixed Sulfur Correction
ON 0.0
Содержание 6400
Страница 2: ......
Страница 9: ...w w w p a r r i n s t c o m 7 Notes 6400...
Страница 12: ...1 Installation P a r r I n s t r u m e n t C o m p a n y 10 Figure 1 2 6400 Calorimeter Back Panel...
Страница 17: ...w w w p a r r i n s t c o m 15 Notes 6400 1...
Страница 19: ...w w w p a r r i n s t c o m 17 Notes 6400 2...
Страница 49: ...w w w p a r r i n s t c o m 47 Notes 6400 5...
Страница 71: ...w w w p a r r i n s t c o m 69 Notes 6400 9...
Страница 81: ...w w w p a r r i n s t c o m 79 Notes 6400 12...
Страница 84: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 82 Chapter 14 Drawings Figure 14 1 1138 Parts Diagram...
Страница 86: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 84 Figure 14 2 6400 Cutaway Right...
Страница 87: ...Drawings 6400 14 w w w p a r r i n s t c o m 85 Figure 14 3 6400 Cutaway Left...
Страница 88: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 86 Figure 14 4 6400 Cover Open 1324DD2 Locking Post...
Страница 91: ...Drawings 6400 14 w w w p a r r i n s t c o m 89 Figure 14 8 A1456DD Rinse Valve Assembly...
Страница 92: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 90 Figure 14 9 6400 Internal Plumbing Diagram...
Страница 93: ...Drawings 6400 14 w w w p a r r i n s t c o m 91 Figure 14 10 6400 Water Tank and Jacket Cooling Solenoid...
Страница 95: ...Drawings 6400 14 w w w p a r r i n s t c o m 93 Figure 14 13 A1268DD Stirrer Motor and Mount...
Страница 96: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 94 Figure 14 14 6400 Bucket Assembly...
Страница 97: ...Drawings 6400 14 w w w p a r r i n s t c o m 95 Figure 14 15 6400 Air Can Assembly Cutaway Left...
Страница 98: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 96 Figure 14 16 6400 Air Can Assembly Cutaway Front...
Страница 99: ...Drawings 6400 14 w w w p a r r i n s t c o m 97 Figure 14 17 A1450DD Bomb Head Assembly View 1...
Страница 100: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 98 Figure 14 18 A1450DD Bomb Head Assembly View 2...
Страница 102: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 100 Figure 14 20 Wiring Diagram...
Страница 103: ...Drawings 6400 14 w w w p a r r i n s t c o m 101 Figure 14 21 Wiring Diagram...
Страница 104: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 102 Figure 14 22 Fuse Diagram...
Страница 105: ...w w w p a r r i n s t c o m 103 Notes 6400 14...
Страница 109: ......
Страница 110: ...587M R03 02 11 14...