6
Standardizations
P a r r I n s t r u m e n t C o m p a n y
48
c
haPter
6
Standardizations
Standardizing the Calorimeter
The Energy Equivalent Factor
The term “standardization”, as used here, denotes
the operation of the calorimeter on a standard
sample from which the energy equivalent or effec-
tive heat capacity of the system can be determined.
The energy equivalent, W or EE of the calorimeter
is the energy required to raise the temperature one
degree, usually expressed as calories per degree
Celsius. Standardization tests should be repeated
after changing any parts of the calorimeter, and
occasionally as a check on both the calorimeter and
operating technique.
Standardization Procedure
The procedure for a standardization test is exactly
the same as for testing a fuel sample. Use a pellet
of calorific grade benzoic acid weighing not less
than 0.9 nor more than 1.1 grams. The corrected
temperature rise, T, is determined from the observed
test data and the bomb washings are titrated to
determine the nitric acid correction. The energy
equivalent is computed by substituting the follow-
ing equation:
W =
Hm + e1 + e2 + e3
T
Where:
W
= Energy equivalent of the calorimeter in
calories per °C.
H
= Heat of combustion of the standard
benzoic acid sample in calories per
gram.
m
= Mass of the sample.
T
= Temperature rise in °C.
e
1
= Correction for heat of formation of
nitric acid in calories. The default value
in the 6400 is 8.
e
2
= Correction for sulfur which is usually 0.
e
3
= Correction for heating wire and com-
bustion of cotton thread. The default
value in the 6400 is 50 cal.
Standard Materials
A bottle of 100 one-gram benzoic acid pellets (Part
No. 3415) is furnished with each calorimeter for
standardizing purposes. The Parr benzoic acid has
been calibrated against NIST benzoic acid. Addition-
al benzoic acid pellets can be obtained from Parr.
For very high precision measurements, a primary
standard benzoic acid powder can be purchased
from the National Institute of Standards & Technol-
ogy, Washington, D.C.
It is not common to have sulfur in standard materi-
als, or to use spikes in standardizations, but the
capabilities have been included in this calorimeter.
Users should take great care to ensure that the
conditions during standardization runs and determi-
nations are as identical as possible.
Caution!
Benzoic acid must always be compressed
into a pellet before it is burned in an oxygen
bomb to avoid possible damage from rapid
combustion of the loose powder. This is best
accomplished by using a Parr 2811 Pellet Press.
Automatic Statistical Calculations
The 6400 Calorimeter includes a provision for
calculating and using a mean energy equivalent for
each of up to 4 separate bomb and bucket combina-
tions. ASTM procedures recommend that the energy
equivalent be determined by averaging ten tests.
The 6400 Calorimeter automatically determines and
uses up to ten tests in its memory and will update
the EE Value as additional standardizations are run.
Only Final Tests will be used in determining and
updating EE values. These values, the number of
tests, and the relative standard deviation for the
tests used in determining the EE value are stored
in the Calibration Data Page under the EE Value for
each bomb.
The user can chose to turn off the automatic aver-
aging and updating procedure and protect the EE
Values by turning ON the protection feature for
the appropriate bomb on the Calibration Data and
Control Page using Protected EE Value.
Содержание 6400
Страница 2: ......
Страница 9: ...w w w p a r r i n s t c o m 7 Notes 6400...
Страница 12: ...1 Installation P a r r I n s t r u m e n t C o m p a n y 10 Figure 1 2 6400 Calorimeter Back Panel...
Страница 17: ...w w w p a r r i n s t c o m 15 Notes 6400 1...
Страница 19: ...w w w p a r r i n s t c o m 17 Notes 6400 2...
Страница 49: ...w w w p a r r i n s t c o m 47 Notes 6400 5...
Страница 71: ...w w w p a r r i n s t c o m 69 Notes 6400 9...
Страница 81: ...w w w p a r r i n s t c o m 79 Notes 6400 12...
Страница 84: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 82 Chapter 14 Drawings Figure 14 1 1138 Parts Diagram...
Страница 86: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 84 Figure 14 2 6400 Cutaway Right...
Страница 87: ...Drawings 6400 14 w w w p a r r i n s t c o m 85 Figure 14 3 6400 Cutaway Left...
Страница 88: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 86 Figure 14 4 6400 Cover Open 1324DD2 Locking Post...
Страница 91: ...Drawings 6400 14 w w w p a r r i n s t c o m 89 Figure 14 8 A1456DD Rinse Valve Assembly...
Страница 92: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 90 Figure 14 9 6400 Internal Plumbing Diagram...
Страница 93: ...Drawings 6400 14 w w w p a r r i n s t c o m 91 Figure 14 10 6400 Water Tank and Jacket Cooling Solenoid...
Страница 95: ...Drawings 6400 14 w w w p a r r i n s t c o m 93 Figure 14 13 A1268DD Stirrer Motor and Mount...
Страница 96: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 94 Figure 14 14 6400 Bucket Assembly...
Страница 97: ...Drawings 6400 14 w w w p a r r i n s t c o m 95 Figure 14 15 6400 Air Can Assembly Cutaway Left...
Страница 98: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 96 Figure 14 16 6400 Air Can Assembly Cutaway Front...
Страница 99: ...Drawings 6400 14 w w w p a r r i n s t c o m 97 Figure 14 17 A1450DD Bomb Head Assembly View 1...
Страница 100: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 98 Figure 14 18 A1450DD Bomb Head Assembly View 2...
Страница 102: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 100 Figure 14 20 Wiring Diagram...
Страница 103: ...Drawings 6400 14 w w w p a r r i n s t c o m 101 Figure 14 21 Wiring Diagram...
Страница 104: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 102 Figure 14 22 Fuse Diagram...
Страница 105: ...w w w p a r r i n s t c o m 103 Notes 6400 14...
Страница 109: ......
Страница 110: ...587M R03 02 11 14...