Menu Descriptions
6400
4
w w w . p a r r i n s t . c o m
35
Bomb 1
The following four values are displayed for the
Bomb # shown in the title on top of the screen.
»
Bomb EE Value: Displays the calculated EE value.
»
# Runs, EE Val.: Displays how many runs have
been used to determine the EE value.
»
Rel. Std. Dev.: Displays the relative standard de-
viation for the series of tests used to determine
the current EE value in percent of the EE value.
»
Bomb Fire Count: Displays the current bomb
firing count or the number of times the bomb
has been fired since it was last serviced. When
this count matches the limit set by Bomb Service
Interval (on the Calibration Data and Controls
screen), the user will be informed that the bomb
is ready for service.
Name:
Enables the operator to assign a
unique alpha-numeric label for the bomb ID.
The ID can be up to 8 characters.
Protect EE Value:
Toggles between OFF and
ON. When set to OFF, the 6400 automatically
updates the EE value as new tests are run.
When set to ON, it keeps the EE value protect-
ed, whether it has been revised manually via
the Manual EE Entry key or calculated by the
instrument.
Update Statistics:
If the Protect EE Value is
set to OFF, pressing this key will cause the EE
Value for this Calorimeter to be updated using
all standardization runs currently in memory
to the limit established in the Calibration Data
and Controls menu. If the Protect EE value is
set to ON, this key is not functional.
Manual EE Entry:
This key allows the user to
manually enter an EE or calibration factor for
a given calorimeter ID or bomb head. If an EE
value is manually entered, it is necessary to
turn the Protect EE Value ON in order to pre-
vent this value from being overwritten by an
automatic update.
Print Standardization Runs:
This key will print
all of the tests that have been incorporated
into the calculated EE value. This will be help-
ful in evaluating a series of tests which fail to
produce a satisfactory EE value and relative
standard deviation.
Reset Bomb Fire Count:
After bomb service,
press this key to reset the fire count to zero.
Control Chart Plot:
Displays the current stan-
dardization runs being used to calculate the
Bomb EE Value. The display will either chart
the value of the Heat of Combustion (HOC) of
the Standard or the Energy Equivalent (EE) de-
pending on the selection on the Control Chart
Parameters menu (see Calibration Data and
Controls menu).
Control Plot Chart Plot
You can display the information used for each test
by selecting the appropriate dot.
Each data point represents a Standardization run
used in the calculation of the EE Value for the Bomb
ID being displayed. The left side of the graph con-
tains the oldest runs and the right represents the
most recent. To view the run data used for a particu-
lar data point, click on the data point with a stylus
and the run data for that point is displayed.
Содержание 6400
Страница 2: ......
Страница 9: ...w w w p a r r i n s t c o m 7 Notes 6400...
Страница 12: ...1 Installation P a r r I n s t r u m e n t C o m p a n y 10 Figure 1 2 6400 Calorimeter Back Panel...
Страница 17: ...w w w p a r r i n s t c o m 15 Notes 6400 1...
Страница 19: ...w w w p a r r i n s t c o m 17 Notes 6400 2...
Страница 49: ...w w w p a r r i n s t c o m 47 Notes 6400 5...
Страница 71: ...w w w p a r r i n s t c o m 69 Notes 6400 9...
Страница 81: ...w w w p a r r i n s t c o m 79 Notes 6400 12...
Страница 84: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 82 Chapter 14 Drawings Figure 14 1 1138 Parts Diagram...
Страница 86: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 84 Figure 14 2 6400 Cutaway Right...
Страница 87: ...Drawings 6400 14 w w w p a r r i n s t c o m 85 Figure 14 3 6400 Cutaway Left...
Страница 88: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 86 Figure 14 4 6400 Cover Open 1324DD2 Locking Post...
Страница 91: ...Drawings 6400 14 w w w p a r r i n s t c o m 89 Figure 14 8 A1456DD Rinse Valve Assembly...
Страница 92: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 90 Figure 14 9 6400 Internal Plumbing Diagram...
Страница 93: ...Drawings 6400 14 w w w p a r r i n s t c o m 91 Figure 14 10 6400 Water Tank and Jacket Cooling Solenoid...
Страница 95: ...Drawings 6400 14 w w w p a r r i n s t c o m 93 Figure 14 13 A1268DD Stirrer Motor and Mount...
Страница 96: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 94 Figure 14 14 6400 Bucket Assembly...
Страница 97: ...Drawings 6400 14 w w w p a r r i n s t c o m 95 Figure 14 15 6400 Air Can Assembly Cutaway Left...
Страница 98: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 96 Figure 14 16 6400 Air Can Assembly Cutaway Front...
Страница 99: ...Drawings 6400 14 w w w p a r r i n s t c o m 97 Figure 14 17 A1450DD Bomb Head Assembly View 1...
Страница 100: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 98 Figure 14 18 A1450DD Bomb Head Assembly View 2...
Страница 102: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 100 Figure 14 20 Wiring Diagram...
Страница 103: ...Drawings 6400 14 w w w p a r r i n s t c o m 101 Figure 14 21 Wiring Diagram...
Страница 104: ...14 Drawings P a r r I n s t r u m e n t C o m p a n y 102 Figure 14 22 Fuse Diagram...
Страница 105: ...w w w p a r r i n s t c o m 103 Notes 6400 14...
Страница 109: ......
Страница 110: ...587M R03 02 11 14...