83
14.1.1 Maintenance plan
Interval
Activity
Description
after 50 assembli Check tools
Clean, check and lubricate tools
weekly
Check hydraulic system Check hydraulic system regularly for leakages
and repair if necessary. Leakages can only
be identified and located if the machine is
cleaned regularly.
daily
Inspection of external
cables and
plugs.
Replace defective cables or plugs.
weekly
Cleaning
Clean the machine with a brush and cloth.
annually
Machine
PARKER INSPECTION, general functional
inspection, oil level check
Parker HPCE Machines & Tool Service Contact:
Tel.+49 (0)521-4048-0
Содержание Parflange 1025
Страница 18: ...18 6 Konformit tserkl rung...
Страница 59: ...59 Operating Instructions Original Operating Instructions Parflange 1025...
Страница 76: ...69 6 Declaration of Conformity...
Страница 118: ...111...