background image

12

DME012-RX - DME080-RX

3.2 Mechanical 

Installation

The Dewpoint Dependent Switching (DDS) system requires a sampling point to be inserted into the piping at the outlet of the dryer.

It is important to ensure that all piping materials are suitable for the application, clean and debris free. The diameter of the pipes must be
sufficient to allow unrestricted inlet air supply to the equipment and outlet gas / air supply to the application.

When routing the pipes ensure that they are adequately supported to prevent damage and leaks in the system.

All components used within the system must be rated to at least the maximum operating pressure of the equipment. It is

recommended that the system be protected with suitably rated pressure relief valves.

A by-pass line may be installed into the system to provide a constant air supply during maintenance.

Caution

The by-pass line will allow untreated air to pass to the application and should only be used when the dryer has
been shut down.

3.3 Electrical 

Installation

Warning

A fully qualified electrical engineer must undertake all electrical work in accordance with local regulations

3.3.1 Mains supply

The dryer is supplied with a 3 core non-detachable mains supply cable as identified below.

1

2

110VAC

POWER

SUPPLY

LIVE

NEUTRAL

EARTH / GROUND

Warning

The Green / Yellow cconductor of the 3 core cable must be bonded to earth (ground)

Содержание DME012-RX

Страница 1: ...Medical Air Dryer DME012 RX DME080 RX Original Language User Guide aerospace climate control electromechanical filtration fluid gas handling hydraulics pneumatics process control sealing shielding EN...

Страница 2: ......

Страница 3: ...llation Commissioning 11 3 1 Locating the equipment 11 3 2 Mechanical Installation 12 3 3 Electrical Installation 12 3 3 1 Mains supply 12 3 3 2 Hygrometer relay 13 4 Operating the equipment 14 4 1 Ov...

Страница 4: ...e Most accidents that occur during the operation and maintenance of machinery are the result of failure to observe basic safety rules and proce dures Accidents can be avoided by recognising that any m...

Страница 5: ...f not performed correctly may lead to damage to this equipment Highlights actions or procedures which if not performed correctly could lead to electric shock Wear ear protection When disposing of old...

Страница 6: ...process is known as Pressure Swing Adsorption PSA Pressure Swing Adsorption PSA A small percentage of dried air is taken from the dryer output flow and is used to regenerate the saturated chamber by e...

Страница 7: ...psi 0 1MPa below nominal compressor output pressure The purge air flow is factory set for 6 bar g 87 psi g minimum system pressure Should the minimum supply pressure be lower than this figure the purg...

Страница 8: ...32 70 DME015 RX 1003 39 5 302 11 9 284 11 2 960 37 8 352 13 86 37 81 DME020 RX 1168 46 0 302 11 9 284 11 2 1125 44 29 352 13 86 42 92 DME025 RX 1333 52 5 302 11 9 284 11 2 1290 50 79 352 13 86 47 103...

Страница 9: ...Remove the equipment from its packaging using the illustrations shown below for guidance and check that it has not been damaged in transit Description Qty DME RX Dryer 1 Dryer Test Certificate 1 If a...

Страница 10: ...LY HYGROMETER DEWPOINT RELAY 110VAC POWER SUPPLY HYGROMETER DEWPOINT RELAY DME012 RX DME040 RX DME050 RX DME080 RX A A B B ECO ECO A A B B ECO ECO 3 4 3 4 3 6 4 1 2 1 2 5 5 1 Mains Supply Cable 2 Hygr...

Страница 11: ...uitable location for the equipment taking into consideration the minimum space requirements for maintenance and lifting equipment as shown in the diagram below When considering the final location of t...

Страница 12: ...rated to at least the maximum operating pressure of the equipment It is recommended that the system be protected with suitably rated pressure relief valves A by pass line may be installed into the sy...

Страница 13: ...is supplied with a 3 core non detachable hygrometer relay cable as identified below Warning The mains supply cable and hygrometer relay cables are clearly identified at the cable gland Ensure that the...

Страница 14: ...tem pressure slowly open the outlet isolation valve If a bypass line has been fitted close the bypass valve 7 Verify that the column pressure gauges are cycling between zero and full system pressure e...

Страница 15: ...ended Service Interval Component Operation Daily Weekly 3 Months 6 Months 12 Months 24 Months 30 Months Dryer Check POWER ON indicator is illuminated Dryer Check STATUS FAULT indicators located on the...

Страница 16: ...006 1 Kit Valve Overhaul DME050 RX DME080 RX 608330007 1 E Desiccant Service AA 11 2 Litre Bag 608203661 See table below Kit Column Seals DME012 RX DME040 RX 608203733 1 Kit Column Seals DME050 RX DME...

Страница 17: ...DME012 RX DME080 RX 5 4 Service Record Date of Commissioning Service Hours Hours Shown Date Serviced By Comments Observations Print Initials 4 000 8 000 16 000 20 000 24 000 28 000 32 000 36 000 40 0...

Страница 18: ...system Check against technical specification Check against technical specification Factory set for 6 bar g 87 psig system pressure domnick hunter trained personnel to adjust Change by domnick hunter...

Страница 19: ...95 Generally in accordance with ASMEVIII Div 1 2004 PED Assessment Route B D EC Type examination Certificate LDS 9900792 5 Notified body for PED Lloyds Register Verification 71 Fenchurch St London EC3...

Страница 20: ......

Страница 21: ...ary Budapest Tel 36 1 220 4155 parker hungary parker com IE Ireland Dublin Tel 353 0 1 466 6370 parker ireland parker com IN India Mumbai Tel 91 22 6513 7081 85 IT Italy Corsico MI Tel 39 02 45 19 21...

Отзывы: