PRESSURE TEST
PRESSURE TESTING: DO NOT USE THREAD SEALANT OF ANY TYPE OR METAL PLUGS
USE A PLASTIC NPT PLUG OR NIPPLE STAND PIPE.
To pressure test the 1½” line from the equipment to the skimmer. Plug the inlet fitting on the inside of the
skimmer. Plug the used suction port(s) in the bottom of the skimmer so that the suction line(s) can be
pressure tested at the same time.
DO NOT OVER-TIGHTEN THESE PLUGS! DO NOT USE A PETROLEUM BASED LUBRICANT!
GUNITE AND FINISHING
1. During gunite phase of construction make a 5" deep
by 6" cutout in the concrete face around the 2"
skimmer venturi return line Fig. 9.
2. Before plastering or applying the finish to the pool,
cut the 2" return line 3" behind the gunite surface
and glue the return guard fitting to the 2" pipe so it
will be flush with the interior surface.
NOTICE
Use only the supplied
return guard
FAILURE TO
INSTALL THE
RETURN GUARD
FITTING AND RETURN GUARD COVER CAN
RESULT IN SERIOUS INJURY OR DEATH.
WARNING
3"
GUNITE
VENTURI PRESSURE
PUMP SUCTION
6"
PLUG OR OPTIONAL
STAND PIPE
2" MIN.
Fig. 9
Gunite stage
STEEL
Required by local building codes.
Wrap the skimmer in a rebar cage using the notches on top of the skimmer to tie the skimmer to the
rebar cage of the pool Fig. 8.
4"
COLD JOINT
TILE
TILE
18"
11"
REBAR CAGE
OVERFLOW
PORT
MIN. 5"
AWAY
FROM
REBAR
ON ALL
SIDES
Fig. 8
Decking