7
TO POOL
GUNITE
VENTURI PRESSURE
PUMP SUCTION
BELOW TOP
OF SKIMMER
OPTIONAL
OZONE
FEED LINE
ABOVE
WATER LEVEL
WATER LEVEL
PLUG OR OPTIONAL
STAND PIPE
6"
2" MIN.
TUBE
ADAPTER
FITTING
1. INSERT 1/4" NTP THREADED
PLUG TO PRESSURE TEST LINE
2. GLUE TUBE ADAPTER
FITTING TO PIPE
3. GLUE TUBE TO SKIMMER
3/4"
PVC PIPE
DRILL CENTER OF SOCKET
MINIMUM 5/8" DRILL BIT
1
2
3
Fig. 3
Optional ozone feed line
Fig. 4
Optional feed tubing kit
Requires optional kit part
#005-702-0002-00
page 18
1. The ¾” side port on the skimmer will
need to be drilled with a 5/8” bit and the
tube adapter fitting installed in the end
of the pipe before it is connected to the
skimmer socket Fig. 4.
2. Plumb a loop in the ¾” line above
water level and then back down before
crossing yard to the equipment to avoid
this line filling with water Fig. 3
3. Run a ¾" schedule 40 PVC line from
the end of the loop back to the pool
equipment and stub up for later use to
connect the ozone generator for injection
of ozone to the skimmer.
4. To pressure test the ozone feed pipe,
install the provided 1/4" NPT plug.
Connect stand pipe at equipment to
header.
OPTIONAL VENTURI OZONE FEED LINE
Содержание Paraskim
Страница 20: ...20...