23
1. Remove all pressure test plugs.
2. Install all baskets and lids.
Valve Installation
START UP - REMOVE PRESSURE TEST PLUGS, INSTALL BASKETS & LIDS
2. Remove clamp and dome
1. Turn off the pump
3. Clean and install base o-ring
Before installing the module, startup the pump and run without the module in place to clear any debris from the feed lines. After
the module is installed and before installing the nozzles, run the water valve to clean out any debris in the cleaning circuits. If a
circuit has more than one nozzle, alternate blocking off all but one nozzle on that circuit one at a time to clean out any debris.
Use of the pause control will hold the valve on that port while doing this. The equipment needs to run for a minimum of ten
minutes before installing the valve module.
9. Inspect for leaks
8. While tightening band clamp, lightly tap
clamp with a screwdriver or wrench
7. Place dome over module. Secure
dome and base with band clamp
5. Turn module slightly until it sits in place
lined up with guide pins
4. Set module into base
7. Turn water valve to "RUN" position
WARNING
Indicates a hazardous situation
which, if not avoided, could result
in death or serious injury.
Turn off pump before
installing valve Do not
stand over valve