Testing
5-2
7986-A2-GB20-00
September 1998
Running Network Tests
Network tests require the participation of your network service provider. To
access the Network Tests screen, follow this menu selection sequence:
Main Menu
→
Test
→
Network & G.703 Tests
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
main/test/network_G.703
Hotwire
Model: 7986
NETWORK & G.703 TESTS
Test
Command Status Results
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Local Loopbacks
Line Loopback:
Start Inactive 00:00:00
Repeater Loopback:
Start Inactive 00:00:00
DTE Loopback:
Start Inactive 00:00:00
Remote Loopbacks
Send Line Loopback: Down
Send Inactive 00:00:00
Pattern Tests
Send and Monitor 511
Stop Active hh:mm:ss - Errors 99999+
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu
MainMenu
Exit
ResetMon
Use the Command column to start or stop a test. When the Status column
shows that a test is Inactive, Start is displayed; when a test is Active, Stop is
displayed. Position the cursor at the desired Start or Stop command and press
Enter.
Selecting a Stop command on the Network Tests screen or Abort All Tests from
the Test menu will not disrupt a network-initiated loopback.
The Results column displays the test duration.
When the Send and Monitor 511 test is active, ResetMon is available to reset the
error counter to zero.
Содержание M/HDSL Standalone Termination Unit HOTWIRE...
Страница 44: ...Initial Startup and Configuration 3 18 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 68: ...Testing 5 10 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 80: ...Security 7 6 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 106: ...Standards Compliance for SNMP Traps B 6 7986 A2 GB20 00 September 1998...
Страница 112: ...Cables and Pin Assignments C 6 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 114: ...Technical Specifications D 2 7986 A2 GB20 00 September 1998 This page intentionally left blank...