5-1
7986-A2-GB20-00
September 1998
Testing
5
Accessing the Test Menu
From the Test menu, you can run network tests, data port tests, and a front panel
lamp test.
To access the Test menu, follow this menu selection sequence:
Main Menu
→
Test
Î
Î
ÎÎ
ÎÎ
main/test
Hotwire
Model: 7986
TEST
Network & G.703 Tests
Device Tests
Abort All Tests
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu
MainMenu
Exit
Select . . .
To . . .
Network and G.703 Tests
Start and stop tests on the G.703 network interface.
Device Tests
Start and stop lamp test.
Abort All Tests
To abort all current tests excluding G.703 and
Network-initiated loopback tests. An aborted test may
continue to run for a few seconds as the abort
command is sent to the remote end and processed.
Содержание M/HDSL Standalone Termination Unit HOTWIRE...
Страница 44: ...Initial Startup and Configuration 3 18 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 68: ...Testing 5 10 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 80: ...Security 7 6 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 106: ...Standards Compliance for SNMP Traps B 6 7986 A2 GB20 00 September 1998...
Страница 112: ...Cables and Pin Assignments C 6 7986 A2 GB20 00 September 1998 This page intentionally left blank...
Страница 114: ...Technical Specifications D 2 7986 A2 GB20 00 September 1998 This page intentionally left blank...