5. Troubleshooting
5-20
May
2003
9000-A2-GB33-20
Test Timeout Feature
A Test Timeout feature is available to automatically terminate a test (as opposed to
manually terminating a test) after it has been running a specified period of time.
It is recommended that this feature be used when the
iMarc unit is remotely
managed through an inband data stream (PVC). If a test is accidently commanded
to execute on the interface providing management access, control is regained
when the specified time period expires, automatically terminating the test.
To use this feature, enable the Test Timeout configuration option, and set a
duration for the test to run in the Test Duration (min) configuration option (see
Configuring General System Options
in the
iMarc SLV Configuration Reference
).
NOTE:
These configuration options do not pertain to tests commanded by the DTE,
like a DTE-initiated External Loopback.
DBM Tests
The Test menu allows you to run PVC loopbacks and test patterns on the unit and
its DBM interface. It is available to users with a security access level of 1 or 2.
Currently, there are no physical tests for a BRI DBM interface.
DBM tests are started and monitored the same as the network tests. See
System
and Test Status Messages
in Chapter 3,
Status and Statistics
, for ISDN
backup-related test messages appearing on the System and Test Status screen.
See
PVC Tests
on page 5-23 on for additional information.
Содержание FrameSaver SLV 9126
Страница 1: ...iMarc SLV Operations Guide Document No 9000 A2 GB33 20 May 2003 ...
Страница 36: ...2 Security and Logins 2 16 May 2003 9000 A2 GB33 20 ...
Страница 128: ...3 Status and Statistics 3 92 May 2003 9000 A2 GB33 20 ...
Страница 200: ...5 Troubleshooting 5 56 May 2003 9000 A2 GB33 20 ...
Страница 210: ...Index IN 10 May 2003 9000 A2 GB33 20 ...