Troubleshooting
8-17
9820-A2-GB20-20
June 2000
PVC Tests
PVC tests can be run on a requested DLCI for a selected interface.
H
When PVC tests are on a multiplexed DLCI between FrameSaver devices,
they are nondisruptive to data, so user data can continue to be sent during
a test.
H
If the device at one end of the circuit is not a FrameSaver device, PVC tests
are on a standard DLCI and are disruptive to data. Also, the Connectivity test
would not appear.
Loopback, and send/monitor pattern tests are available for each interface on the
selected DLCI. FrameSaver devices should be at each end of the circuit. If a
PVC Loopback is started at one end of the circuit, the other end can send and
monitor pattern tests.
The example below shows a PVC Test screen for a FrameSaver unit with the
multiplexed DLCI 550 selected. If a standard DLCI was selected, (
Disruptive
),
rather than (
Non-Disruptive
), would be displayed after Test. Also, the
Connectivity test would not appear.
PVC Tests Screen Example
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
main/test/network_pvc
9820-2M
Device Name: Node A
5/13/2000 6:03
NETWORK PVC TESTS
DLCI Number: 550
Test (Non-Disruptive)
Command
Status
Result
PVC Loopback:
Start
Inactive
0:00:00
Send Pattern:
Start
Inactive
0:00:00
Monitor Pattern:
Start
Inactive
0:00:00
Sequence Errors
99999+
Data Errors
99999+
Connectivity:
Start
Inactive
RndTrip Time (ms) 99999
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu
MainMenu
Exit
NOTE:
Errors encountered during these tests may be caused by mismatched CIRs
in the two FrameSaver devices. If errors are detected, verify the CIR
configuration and retest.
Содержание 9820
Страница 10: ...Contents viii 9820 A2 GB20 20 June 2000...
Страница 30: ...User Interface and Basic Operation 2 10 9820 A2 GB20 20 June 2000 This page intentionally left blank...
Страница 98: ...Configuration Options 4 62 9820 A2 GB20 20 June 2000 This page intentionally left blank...
Страница 208: ...Setting Up Network Health for FrameSaver Devices 11 10 9820 A2 GB20 20 June 2000 This page intentionally left blank...
Страница 216: ...Menu Hierarchy A 4 9820 A2 GB20 20 June 2000 This page intentionally left blank...
Страница 246: ...SNMP MIBs and Traps and RMON Alarm Defaults B 30 9820 A2 GB20 20 June 2000...
Страница 266: ...Technical Specifications D 4 9820 A2 GB20 20 June 2000...
Страница 270: ...Equipment List E 4 9820 A2 GB20 20 June 2000 This page intentionally left blank...