GS-SB1 Single Side Burner Operator Manual
Grill Island Preparation
•
17
Custom-built Island Ventilation
Every component within the grill island must be vented – refrigerator, LP
gas cylinder, etc. Vent locations must be determined by a licensed
professional according to the design and configuration of your custom-
built island. Figure 7 illustrates examples of possible venting locations
for custom-built grill islands.
Figure 7 Example Vent Locations
Custom-built Island Cut-outs
Ensure any island cut-out opening is no larger than the outside frame of the appliance being installed. The
appliance should rest on the lip of the frame.
Figure 8 illustrates sample cut-out sizes for a grill island. Here are some other considerations:
•
Ensure your grill island cavity is adequately vented. Consult your local licensed professional and local
codes for adequacy requirements
•
Ensure your outdoor kitchen is constructed out of non-combustible materials
•
If your outdoor kitchen is constructed of any combustible materials, an insulated jacket is REQUIRED
•
Cutout dimensions do not allow for lid clearance or other measurement requirements. See Single
Side Burner Dimensions for specifics
•
Please allow for a tolerance of +/- 1/8"; we recommend having your appliances in hand to measure
before making final cutouts in your custom-built grill island
Figure 8 Example Island Cut-outs for Paradise Grills Appliances
Содержание GS-SB1
Страница 1: ...GS SB1 Single Side Burner Operator Manual...